Desmond v Mount Isa City Council & Ors [1990] QSCFC 64 [1991] 2 Qd R 482
IN THE SUPREME COURT OF QUEENSLAND
3 REVISED CCPI.ES ISSUED \3 j
| Court reporting Bureau t
j Date-. ^ l^O j
nMwi-iw^i-^wiii^.j Yr~*»-CT, V-'~>*?TSi‘irrirT^
qaj ob¥
i
FULL COURT NO. 293^ of 1979
BEFORE :
The Chief Justice (Mr. Justice Macrossan)
Mr. Justice Kelly S.P.J.
Mr. Justice Connolly
BRISBANE, 7 SEPTEMBER 1990
10
(Copyright in this transcript is vested in
the Crown. Copies thereof must not be made
or sold without the written authority of the
Chief Court Reporter, Court Reporting Bureau.)
20
BETWEEN:
WAYNE JOSEPH DESMOND
(Plaintiff) Appellant
- and -
MOUNT ISA CITY COUNCIL
(First Defendant) First Respondent 30
- and -
QUEENSLAND HOUSING COMMISSION
(Second Defendant) Second Respondent
- and -
McINTYRE &. ASSOCIATES PTY.LTD.
(Third Defendant) Third Respondent
- and -
JOHN McGILLIVRAY McINTYRE,
ANTHONY O'BRIEN LOUGHNAN,
RICHARD GRENVILLE BARRETT,
DAVID HARRY JAMES,
JOHN WILLIAMS,
HARRY MIKELSONS and
LEONARD ERIC MOORE
(Fourth Defendants) Fourth Respondents
JUDGMENT
"THE CHIEF JUSTICE: Having heard the further arguments
this morning, the orders which I think should be made will
now be the s e; __________________________________________________ 60
-Govt. Printer, Qid,
l
[1990] QSCFC 64
-- 1 of 47 --
1
10
20
30
40
50
6^
, ,'M
The appeal against the first respondent should be
allowed and that part of the judgment below which provided
that the plaintiff recover nothing against the first
defendant should be set aside and in lieu it should be
ordered that there be judgment for the plaintiff against the
defendant for $750,335.50, such judgment to be dated 13 July 1989 .
The appeal against the second and fourth respondents
should be dismissed.
I think also that the further order in respect of costs,
which counsel for the plaintiff/appellant passed up to us
that is in two paragraphs -should be made,and I will
initial that draft.
I further think that the orders should be made in the terms
referring to"undertaking". which counsel for the plaintiff/
appellant also passed up to us -that is undertaking in
respect to payment of the amount, and disposal of the amount
under the judgment in the immediate circumstance -and I shall
initial that order as well, it having been altered already
in the course of discussion by adding the words on the third
last line of the first page, after the words "solicitors for
the appellant" , the words "on the terms hereinafter set
forth" and the reference to "leave to appeal"on that first
page amended also to "special leave to appeal". That is
in the two instances where it there . appears .
I think that it.i.should. further be ordered as follows:
the further hearing of the issues, if any, between the first,
third and fourth respondents- not disposed of by this appeal,
be remitted to the trial judge.
MR. JUSTICE KELLY: In view of the discussion that has
now taken place I agree that, in view of the orders which I
— Govt. Printer, Qld.
i '
20
30
40
50
60
2
-- 2 of 47 --
IN THE SUPREME COURT OF QUEENSLAND
| REVISED COPIES ISSUE!
| Court Reporting Bureau
Iff" JV ^ / ctD
FULL COURT No. 2935 of 1979
BEFORE :
10
The Chief Justice (Mr. Justice Macrossan) •/
Mr. Justice Kelly S.P.J.. ......
Mri:, Justice Connolly 10
BRISBANE, 6 SEPTEMBER 1990
(Copyright in this transcript is vested in
the Crown. Copies thereof must not be made
or sold without the written authority of the
Chief Court Reporter , Court Reporting Bureau.)
x>
BO
BETWEEN :
WAYNE JOSEPH DESMOND
(Plaintiff)
- and -
MOUNT ISA CITY COUNCIL
(First Defendant)
- and -
Appellant
First
Respondent
20
40
50
QUEENSLAND HOUSING COMMISSION
(Second Defendant
- and -
Second
Respondent
McINTYRE & ASSOCIATES PTY.LTD.
(Third Defendant)
Third
Respondent
- and -
40
JOHN McGILLIVRAY McINTYRE,
ANTHONY O'BRIEN LOUGHNAN,
RICHARD GRENVILLE BARRETT,
DAVID HARRY JAMES,
JOHN WILLIAMS, HARRY MIKELSONS
and LEONARD ERIC MOORE Fourth
(Fourth Defendants) Respondents 50
JUDGMENT
THE CHIEF JUSTICE: In my opinion the appeal should be
allowed against the first and fourth respondents and the
further orders should be made to which I refer in my reasons,
60
-Govt. Printer, Qid.
l
-- 3 of 47 --
I publish my reasons.
MR. JUSTICE KELLY: In my opinion the appeal against
the first respondent should be allowed and that part of the
judgment below which provided that the plaintiff recover
’ nothing • against the first' defendant '= ’ shb'uTd"'b¥T "set^
in lieu it should be ordered that there be judgment for the
plaintiff against the first defendant for $750,335.50 with
costs, including reserved costs if any, to be taxed, such
judgment to be dated 13 July 1989.
It should further be ordered that the first respondent pay
the appellant's costs of the appeal to the extent that those
costs relate to his appeal against the first respondent,
to be taxed.
The appeal against the second respondent and the
fourth respondents should be dismissed, with costs.
I publish my reasons.
MR. JUSTICE CONNOLLY: I agree with the order proposed
by the Senior Puisne Judge.
I publish my reasons.
THE CHIEF JUSTICE: The order of the Court will then be
as proposed by the Senior Puisne Judge.
MR. DOUGLAS: Perhaps we should seek leave to read and
file now an. affidavit in support of the stay. If I could
hand up the original and three copies of that.
THE CHIEF JUSTICE: We will give you leave, Mr. Douglas,
then to file and read that affidavit.
—Govt. Printer, Qld.
2
-- 4 of 47 --
proposed yesterday, the orders as now indicated by the
Chief Justice should be those to be made.
MR. JUSTICE CONNOLLY: I agree.
THE CHIEF JUSTICE: Those will be the orders of the
Court.
10
30
-- 5 of 47 --
s
f' C- o/o
£>■
IN THE SUPREME COURT
OF QUEENSLAND
FULL COURT
BETWEEN :
WAYNE JOSEPH DESMOND
(Plaintiff)
-and-
No. 2935 of 1979
Appellant
MOUNT ISA CITY COUNCIL
(First Defendant) First Respondent
-and-
OUEENSLAND HOUSING COMMISSION
(Second Defendant) Second Respondent
-and-
McINTYRE & ASSOCIATES PTY . LTD.
(Third Defendant) Third Respondent
-and-
JOHN McGILLIVRAY McINTYRE, ANTHONY
O'BRIEN LOUGHNAN, RICHARD GRENVILLE
BARRETT, DAVID HARRY JAMES. JOHN
WILLIAMS, HARRY MIKELSONS
and LEONARD ERIC MOORE
(Fourth Defendants ) Fourth Respondents
CHIEF JUSTICE
KELLY SPJ
CONNOLLY J
Reasons for judgment delivered by
the Chief Justice, Kelly SPJ and
Connolly J on 6th September 1990.
SEVENTH SEPTEMBER 1990 JUDGMENT
"APPEAL AGAINST THE FIRST RESPONDENT
ALLOWED, THAT PART OF THE JUDGMENT BELOW
WHICH PROVIDED THAT THE PLAINTIFF RECOVER
NOTHING AGAINST THE FIRST DEFENDANT SET
ASIDE AND IN LIEU ORDER THAT THERE BE
JUDGMENT FOR THE PLAINTIFF AGAINST THE
-- 6 of 47 --
SUCH FIRST DEFENDANT FOR $750,335.50,
JUDGMENT TO BE DATED 13 JULY 1989.
THE APPEAL AGAINST THE SECOND AND FOURTH
RESPONDENTS DISMISSED.
FURTHER ORDER THAT THE PLAINTIFF PAY THE
COSTS OF THE SECOND, THIRD AND FOURTH
DEFENDANTS OF AND INCIDENTAL TO THE ACTION
INCLUDING RESERVE COSTS TO BE TAXED, AND
THAT THE FIRST DEFENDANT PAY THE
PLAINTIFF'S COSTS OF AND INCIDENTAL TO THE
ACTION INCLUDING RESERVED COSTS TO BE
TAXED, SUCH COSTS TO INCLUDE THE COSTS
PAYABLE BY THE PLAINTIFF TO THE SECOND,
THIRD AND FOURTH DEFENDANTS.
FURTHER ORDER THAT THE APPELLANT PAY THE
COSTS OF AND INCIDENTAL TO THE APPEAL OF
THE SECOND AND FOURTH RESPONDENTS, AND OF
THE THIRD RESPONDENT INCURRED UP TO 30TH
DAY OF NOVEMBER, 1989, IN EACH CASE TO BE
TAXED, AND THAT THE FIRST RESPONDENT PAY
THE APPELLANT'S COSTS OF AND INCIDENTAL TO
THE APPEAL TO BE TAXED, SUCH COSTS TO
INCLUDE THE COSTS PAYABLE BY THE APPELLANT
TO THE SECOND, THIRD AND FOURTH
RESPONDENTS.
FURTHER ORDER THAT UPON THE FIRST
RESPONDENT UNDERTAKING THAT IF AN
APPLICATION IS MADE FOR SPECIAL LEAVE TO
APPEAL TO THE HIGH COURT OF AUSTRALIA THAT
APPLICATION WILL BE PURSUED BY IT WITH
REASONABLE DILIGENCE, AND IF SPECIAL LEAVE
TO APPEAL IS GIVEN BY THE HIGH COURT OF
AUSTRALIA TO THE FIRST RESPONDENT THE
FIRST RESPONDENT WILL PURSUE SUCH APPEAL
WITH REASONABLE DILIGENCE, THE APPELLANT
AND HIS SOLICITORS UNDERTAKE THAT, UPON
THE FIRST RESPONDENT SATISFYING THE
JUDGMENT GIVEN BY THE FULL COURT, THE
AMOUNT PAID IN RESPECT OF THE APPELLANT'S
CLAIM INCLUSIVE OF INTEREST BUT EXCLUDING
COSTS WILL , APART FROM THE SUM OF
$20,000.00 BE HELD BY THE SOLICITORS FOR
THE APPELLANT ON THE TERMS HEREINAFTER SET
FORTH IN A SEPARATE INTEREST BEARING
ACCOUNT IN A BANK AND WILL BE RETAINED
THERE TOGETHER WITH ANY INTEREST WHICH
ACCRUES FROM TIME TO TIME THEREON AND WILL
NOT BE PAID TO, OR AT THE DIRECTION OF,
THE APPELLANT UNTIL:
(a) 22 DAYS AFTER THE DATE ON WHICH THE
JUDGMENT OF THE FULL COURT IS SERVED ON
THE SOLICITORS OR THE FIRST RESPONDENT; OR
(b) IF DURING THE PERIOD SPECIFIED IN (a)
ABOVE, THE FIRST RESPONDENT FILES AND
SERVES ON THE SOLICITORS FOR THE APPELLANT
AN APPLICATION FOR SPECIAL LEAVE TO APPEAL
TO THE HIGH COURT OF AUSTRALIA AGAINST THE
JUDGMENT OF THE FULL COURT AGAINST THE
-- 7 of 47 --
FIRST RESPONDENT IN FAVOUR OF THE
APPELLANT, UNTIL THAT APPLICATION IS HEARD
AND DETERMINED BY THE HIGH COURT OF
AUSTRALIA OR DISMISSED FOR WANT OF
PROSECUTION OR WITHDRAWN OR OTHERWISE
FINALLY DISPOSED OF; OR
(c) IF THE HIGH COURT OF AUSTRALIA GIVES
LEAVE TO THE FIRST RESPONDENT TO APPEAL
AGAINST THE DECISION OF THE FULL COURT IN
FAVOUR OF THE APPELLANT AGAINST THE FIRST
RESPONDENT, UNTIL THE HIGH COURT GIVES
JUDGMENT IN THAT APPEAL OR UNTIL THE
APPEAL IS DISMISSED FOR WANT OF
PROSECUTION OR WITHDRAWN OR UNTIL SPECIAL
LEAVE IS REVOKED OR UNTIL THE APPEAL IS
OTHERWISE FINALLY DISPOSED OF, AND
AS IF A RESULT OF THE DECISION OF THE HIGH
COURT THE JUDGMENT IN FAVOUR OF THE
APPELLANT AGAINST THE FIRST RESPONDENT IS
SET ASIDE, TO REPAY THE AMOUNT SO
DEPOSITED TOGETHER WITH ALL INTEREST
ACCRUED THEREON TO THE FIRST RESPONDENT AS
SOON AS IT CAN BE OBTAINED FROM THE BANK,
AND THE SOLICITORS FOR THE APPELLANT
UNDERTAKE THAT, IF ANY AMOUNT IS PAID TO
THEM IN RESPECT OF THE COSTS PAYABLE BY
THE FIRST RESPONDENT TO THE APPELLANT,
WHILE ANY SUM IS RETAINED IN A BANK
ACCOUNT PURSUANT TO THE ABOVE UNDERTAKING,
SUCH AMOUNT WILL BE RETAINED IN A SEPARATE
INTEREST BEARING ACCOUNT IN A BANK BY THE
SOLICITORS FOR THE APPELLANT UNTIL THE
EXPIRATION OF THAT PERIOD, AND IF THAT
ORDER FOR COSTS IS SET ASIDE OR MODIFIED
SUCH THAT MONIES WHICH HAD BEEN PAID WOULD
NO LONGER BE PAYABLE BY THE FIRST
RESPONDENT TO THE APPELLANT, TO REPAY ANY
SUCH MONIES AND INTEREST TO THE SOLICITORS
FOR THE FIRST DEFENDANT.
FURTHER ORDER THAT THE FURTHER HEARING OF
THE ISSUES, IF ANY, BETWEEN THE FIRST,
THIRD AND FOURTH RESPONDENTS, NOT DISPOSED
OF BY THIS APPEAL, BE REMITTED TO THE
TRIAL JUDGE."
-- 8 of 47 --
IN THE SUPREME COURT
OF QUEENSLAND
Before the Court of Criminal Appeal
The Chief Justice
Mr. Justice Kelly S.P.J.
Mr. Justice Connolly
No. 2935 of 1979
BETWEEN:
WAYNE JOSEPH DESMOND
(Plaintiff) Appellant
-and-
MOUNT ISA CITY COUNCIL
(First Defendant)
-and-
OUEENSLAND HOUSING COMMISSION
(Second Defendant)
-and-
McINTYRE & ASSOCIATES PTY . LTD.
(Third Defendant)
First
Respondent
Second
Respondent
Third
Respondent
-and-
JOHN McGILLIVRAY McINTYRE . ANTHONY
O'BRIEN LOUGHNAN , RICHARD GRENVILLE BARRETT .
DAVID HARRY JAMES . JOHN WILLIAMS.
HARRY MIKELSONS and
LEONARD ERIC MOORE
(Fourth Defendants) Fourth
Respondents
JUDGMENT - THE CHIEF JUSTICE
Delivered the sixth day of September, 1990.
-- 9 of 47 --
CATCHWORDS :
Counsel :
Solicitors :
Mr. C. Brabazon Q.C. and D.J. McGill for the
Appellant .
Mr. R.K. Douglas Q.C. and Mr. P.C. Stevens for the
First Respondent.
Mr. K. Boulton for the Second Respondent.
Mr. K.C. Fleming Q.C. and Mr. R.M. Stenson for the
Third Respondent.
Mr. J. A . Griffin Q.C. and Mr. M.W. Forde for the
Fourth Respondent.
Messrs. Barry & Wilsson for the Appellant.
Messrs. Quinlan Miller & Treston for the First
Respondent .
Crown Solicitor for the Second Respondent.
Messrs. Thynne & Macartney for the Third Respondent.
Messrs. Murrell Stephenson for the Fourth
Respondent.
Hearing dates : 25, 26 and 30 July, 1990
-- 10 of 47 --
IN THE SUPREME COURT
OF QUEENSLAND
BETWEEN :
No. 2935 of 1979
WAYNE JOSEPH DESMOND
(Plaintiff)
-and-
Appellant
MOUNT ISA CITY COUNCIL
(First Defendant)
-and-
OUEENSLAND HOUSING COMMISSION
(Second Defendant)
-and-
McINTYRE & ASSOCIATES PTY . LTD.
(Third Defendant)
-and-
First
Respondent
Second
Respondent
Third
Respondent
JOHN McGILLIVRAY McINTYRE . ANTHONY
O'BRIEN LOUGHNAN. RICHARD GRENVILLE BARRETT.
DAVID HARRY JAMES, JOHN WILLIAMS.
HARRY MIKELSONS and
LEONARD ERIC MOORE
(Fourth Defendants) Fourth
Respondents
JUDGMENT - THE CHIEF JUSTICE
Delivered the sixth day of September, 1990.
Since a sufficiently full reference to the facts is made
in the reasons prepared by Connolly J. it will not be necessary
for me to set them out so extensively.
It was alleged that the first respondent (the Council) and
the second respondent (the Commission) were, in relevant
respects, negligent in respect of the design and construction of
Park Street which runs downhill from Marian Street in a northerly
-- 11 of 47 --
2
direction towards the intersection with Delacour Drive where the
accident occurred. The negligence was said to result from the
fact that the design adopted and the construction implemented
caused a build-up of gravel in that intersection area after rain.
It was also alleged that the fourth defendants, a firm of
engineers, were responsible since they had produced the design
which was adopted.
A storm which resulted in the wash-down of a significant
quantity of gravel to the intersection area occurred on 21 March,
1977. This gravel had not been cleared by 7 April, 1977 and was
directly responsible for the plaintiff's fall from his motor
cycle causing his injuries. The failure to clear up the gravel
after it had been deposited was said to provide an additional
reason for holding the plaintiff entitled to recover.
A number of factual matters were decided by the learned
trial judge and no contest now arises in respect of most of them.
This renders it appropriate to look directly at a number of
significant findings since the real question is what are the
appropriate further conclusions to be drawn.
The Commission's area of responsibility could not on any
argument be said to extend beyond the periphery of its estate
and, even so, it has to be acknowledged that the Council was
responsible for the overall design of the road and drainage works
for the whole area. The Commission not only had no say in the
standards to be applied for the upper part of Park Avenue but,
in respect of the lower part, including the relevant intersection
area, the Commission was, in reality, obliged to execute works
the details of which were determined and directed by the Council.
-- 12 of 47 --
3
The engineers were the Council's usual consulting engineers.
Although the contract under which the works in question were done
was one entered into between the engineers and the Commission,
detailed directions in the course of the work emanated from the
Council in respect of the upper part of Park Avenue. It could
be said that any apparent division of responsibility between the
two authorities merely reflected their respective shares of the
cost since the totality of the work was in the form devised and
insisted upon by the Council.
The trial judge has found that it was likely that after
heavy rain there would be a large amount of gravel washed down
from the upper areas to accumulate on the intersection. Although
this was foreseeable the prospect was ignored and no provision
was made in the design to prevent this occurrence or to carry off
the gravel. It was found that the Council was aware that gravel
would wash down Park Avenue to the intersection area and the
extent to which this would occur is obviously an important
matter. Complete precision does not emerge on this aspect but
the sense of the findings and the tenor of the evidence justifies
its being said that the amount of gravel after heavy rain would
be substantial. It would be dangerous for motor-cyclists even
in storms of the one-in-five-year intensity for which the system
was designed, and also for heavy downpours of lesser intensity.
It is also open to accept and it should be accepted that while
the build-up of gravel would be somewhat less in its potentially
dangerous aspects for a five-year storm than for a storm of the
intensity which in fact occurred on 21 March the difference for
present purposes would not be significant. It can also be said
-- 13 of 47 --
4
that if the upper reaches of Park Avenue had been fully sealed,
curbed and channelled then there would certainly have been a
substantial lessening of the risk of gravel deposit and, in
practical terms, it is reasonable to conclude that the risk which
resulted from the storm of March, 1977 would have been avoided
altogether. The additional cost of that work in upper Park
Avenue at the time the road works were undertaken would have been
$2,460.00.
In considering the possible liability of the various
defendants the trial judge thought that the engineers could be
under a duty of care to the plaintiff because they "had entered
upon the work". This test, which he adopted from Voli v.
Inglewood Shire Council (1962-1963) 110 C.L.R. 74 at 85, can be
accepted as the basis upon which the engineers' liability to
third parties could arise in tort independently of their contract
with their principals.
In dealing with liability, especially in the case of the
Council, the trial judge, having decided that it was reasonably
foreseeable that the form of road construction adopted for the
upper reaches of Park Avenue involved the risk of injury to users
of the road through skidding in collected gravel, then went on
to consider what a reasonable man would have done by way of
response to this foreseeable risk. Would he, if he were in the
position of the road authority, have fully sealed, curbed and
channelled Park Avenue? The judge posed the question to himself
in this fashion in view of the statements of principle in Wyong
Shire Council v. Shirt (1979-1980) 146 C.L.R. 40. It may be
accepted that foreseeability of risk alone does not precisely
-- 14 of 47 --
5
state the criterion which decides whether a duty of care exists
and the extent to which steps will be necessary to avoid
liability in response to that duty. Apart from questions of
proximity (as to which no special problem arises in the present
case since it involves the established category of highway user:
see e.g. Sutherland Shire Council v. Hevman (1984-1985) 157
C.L.R. 424 at 441 per Gibbs C.J.), liability will depend upon the
magnitude of risk, the degree of probability of harm and factors
of convenience and expense. This appears from the reasons of
Mason J. in Wyong Shire Council v. Shirt (supra) at 47.
The trial judge answered the question which he thought arose
by saying that a reasonable man in the position of the Council
would not have fully sealed, curbed and channelled and he gave
three reasons for this conclusion. He said that there had been
no previous reports of accidents (this must be intended to
reflect the frequency at which accidents might be expected to
occur because he had already decided that they were foreseeable,
that is, that they could occur). He then said that the
accumulations of gravel could be dealt with by removal after
heavy rain. Finally he said that the expense of dealing with all
similar areas or areas even more prone to gravel build-up within
Mount Isa would be very high and there was no reason to give
priority of attention to the Park Avenue intersection.
It seems to me that the question whether a local authority
should select one particular problem area for attention rather
than others presenting equal dangers is not the same as the
question whether, when new work is being executed which will
involve the creation of a danger, some further expenditure,
-- 15 of 47 --
6
extremely modest in relation to the overall cost of the scheme,
should be undertaken to ensure that the dangerous feature does
not intrude. There is reason, then, to examine more closely the
relevance and the weight of the considerations which weighed with
his Honour in deciding that the Council, in response to its
obligation to be "reasonable", need not have adopted the extra
precautions which would have obviated the danger it was bringing
into existence.
It is, with the greatest of respect, necessary to avoid an
over-ready acceptance of the approach which his Honour adopted.
It seems that he may have concluded that it was not negligent of
the Council to build or arrange to build the relevant road area
in the way that it did because he unduly compartmentalised two
aspects of the problem by giving separate attention to design and
the subsequent clean-up operations. In concluding that the
design could not be regarded as unacceptable it may, first of
all, be detected that he concentrated heavily upon the capacity
of the adopted design to dispose of water without giving
sufficient emphasis at all points of his reasoning to its
adequacy to accommodate water-borne gravel. More importantly,
he appears, in effect, to have decided that the design was
satisfactory on a premise which he did not at all points fully
express, namely that it was satisfactory only if it was assumed
that supplementary clearing and maintenance works would be
continually' carried out.
The preferable assessment of the situation should be that
the design was no more than provisionally satisfactory and the
condition of its suitability was not met in the present case
-- 16 of 47 --
7
because the work which was essential to keep the highway in a
satisfactory state was not carried out. To hold otherwise and
to decide that a design should be regarded as satisfactory
because supplementary work could keep it that way could be
tantamount in a particular case to deciding that if continuing
and specialised work programmes in the future could theoretically
keep a construction safe but from the moment of conception and
execution the authority has no intention of adhering to that
necessary future regime then the design, as such, must be
regarded as adequate. Putting the matter another way the design,
in a case like the present, must be judged having in mind the
chance or risk that the necessary support procedures will not be
carried out.
Support work of the kind under discussion is different from
standard maintenance work which is necessary to ensure the
continuing viability of all man-made works. What falls for
discussion in the present case is the suitability of a design
which, from its beginning, is subject to particular weakness in
that it is built in a way which ensures that it will in the
future periodically attract an accumulation of gravel in
dangerous quantities. The gravel which the Council's design
caused to be transported to and retained upon the intersection
area was not in that location, a part of the fabric of the
highway but was a foreign or artificial accumulation upon its
surface .
It does not, in principle, appear to matter that in the
ordinary course of events it could be expected that some time
would elapse before the operation of natural forces would result
-- 17 of 47 --
8
in the gravel gathering there. To take a more extreme example,
to dig a trench and to leave it open upon a highway in conditions
of good visibility may not import any danger but a work
constructed and left in that state will inevitably become
dangerous when, if left unlit, the day draws to a close and night
falls. In the present case it can be regarded as sufficiently
certain that the consequence of the design adopted was that
gravel would from time to time collect upon the intersection
area. The design which was adopted caused, admittedly somewhat
indirectly, the foreign element, gravel, to accumulate on the
intersection and it is difficult to see why acts which so caused
that accumulation should not be attributed to the actor
responsible just as much as if workmen for whom it was
responsible had dumped the same quantity of gravel directly on
to the surface of the roadway. An action amounting to a
misfeasance should, in either case, be regarded as the agency
which caused the placing of the gravel even though, again in
either case, it might be a non-feasance which results in the
gravel, once collected there, being allowed to remain. Further,
as Buckle v. Bavswater Road Board (1936) 57 C.L.R. 259 (shortly
to be referred to in greater detail) shows, the non-feasance
immunity is available only in respect of the exercise of highway
powers and not in respect of powers to deal with drainage. It
is at least partly in connection with the exercise of drainage
powers that the design adopted involved the collection, over an
extensive catchment area, of storm water with a gravel bearing
capacity and the channelling of that laden water towards the
Delacour intersection area. However, for reasons which will
-- 18 of 47 --
9
appear I do not need to deal further with the possible relevance
of the distinction between road and drainage responsibilities.
The Council both directly in respect of the work which it
ordered to be executed in upper Park Avenue (the restricted
roadway sealing and the absence of curbing and channelling) and
the work which in detail it was in a position to enforce in the
lower areas adopted a design the satisfactoriness of which falls
to be judged as a whole. On this basis it must be adjudged
deficient. The reasons for concluding that this deficiency in
design should involve the Council in legal liability in the
present case will be further explained shortly.
On the other hand, there is no obvious basis upon which the
Commission should be regarded as involved in liability because
it was the Council's design which was, in a practical sense,
implemented and there is no reason to think that the Commission
by any action of its own influenced the adoption of it. It was
nothing more, in relevant respects, than a conduit for the
Council's instructions in the construction of the lower portion
of the road and drainage works .
It appears that the position of the engineers may have to
be judged differently since Voli ' s case (supra) indicates that
their liability in tort to third parties can arise from their
undertaking the design work.- So far as possible liability to
future road users is concerned, the tests of foreseeability and
proximity are readily satisfied.
It is desirable to.consider further the acceptability of the
proposition which the trial judge acted upon namely that the case
fell within the category of failure to maintain a road surface
-- 19 of 47 --
10
which had been properly constructed. Mere failures to maintain
are, according to the traditional distinction, regarded as acts
of non-feasance for which road authorities are held not liable.
His Honour considered that nothing in the present case suggested
that the construction of the road-works and drainage system in
question created a new or additional danger. Reasons for
suggesting that this may not be a valid assessment have already
been suggested and it is necessary to see whether decided cases
support what has been said.
The case which is of the greatest assistance in present
circumstances is Buckle v. Bavswater Road Board (supra) .
Although differing conclusions were there reached by the judges
this was because of variations in approach to the factual
question whether the relevant drainage system had been installed
for roadway or drainage purposes. Dixon J. thought that the
drain was put down for roadway purposes, Latham C.J. considered
the evidence showed it to have been installed partly for ordinary
drainage purposes if also for road purposes while McTiernan J.
treated the drain as a foreign or "artificial" construction
introduced into the highway. While the approaches and
conclusions varied there is no reason not to accept the
statements of principle made by Dixon J. and in some respects
they are particularly helpful in the present case.
At 281 of Buckle , Dixon J. stated the accepted rule that no
civil liability is incurred by a road authority by reason of any
neglect on its part to repair or maintain a road - the so called
"non-feasance" rule. However, at 283 he said that it is a civil
wrong for an authority to make roads unsafe or dangerous that is
-- 20 of 47 --
it is liable if it creates dangers that ordinary care and skill
could avoid. This is the familiar misfeasance rule. More
significantly, at 284 he pointed out that dangers created may be
made relatively harmless by use of some precautions such as
guarding or lighting but if the precaution is discontinued
consequences will ensue for which the authority will be liable.
This liability will arise "not on the ground that [the authority]
failed to exercise its powers so as to prevent [the
consequences], but on the ground that it was the active agent
in causing an unnecessary danger in the highway". Later on the
same page he said "the improper nature of the original act of the
road authority must always be the foundation of the complaint
against it." He then proceeded to draw a distinction between
the cases where the work "actively" done by the road authority
will make the highway dangerous except for the presence of
"continual subsequent safeguards" and the different class of
cases in which the positive activity of the road authority puts
the highway in a condition where it is "perfectly proper and
safe" although liable over time through wear and tear to
depreciate. Depreciation acting upon works which are properly
installed will not render the road authority liable since it is
not liable for what is usually described as non-feasance. The
situation is that if a dangerous condition necessarily results
from the original construction of the roadway there will
ordinarily be liability but there will be no liability if "judged
according to the standards of the time and the circumstances then
prevailing, the design and execution of the work were not
improper or unsafe". In the present case the design of the
-- 21 of 47 --
work as being appropriate to carry off expected quantities of
storm water has been found to be proper and adequate and in the
arguments advanced on the appeal no quarrel is made with that
finding. However, the design and execution of the road-works
cannot be regarded as unqualifiedly proper and safe for traffic
purposes since the safety of those works was made dependent upon
the continuation of a careful programme of clearing of gravel
deposits and because it was the way that the road system was
built which gave rise to the need for continuing attention. The
subsequent failure to clear the gravel deposit which caused the
plaintiff's injuries rendered operative the potentially dangerous
deficiency which was a feature of the design.
Dixon J. in his reasons in Buckle provides examples of
decisions where the design and construction method adopted were
standard or normal enough at the time of execution but became
dangerous due to the operation of ordinary wear, tear and
depreciation. There may be a borderline, perhaps sometimes
difficult to draw, and certain of the cases cited by Dixon J. may
be regarded as illustrations of judgments reached on factual
assessments. In the present case the plaintiff's complaint is
not with the Council's general policy of limited sealing of road
surfaces which might in many instances have been perfectly
properly employed but it is directed towards its adoption in a
particular situation where a foreseeable mischief or danger would
inevitably result. As a matter of judgment, in particular cases
it may be proper to conclude that highway designs are defective
in their capacity to deal with the effect of foreseeable dangers
-- 22 of 47 --
13
intruding at particular locations. The present case falls in
that class.
In the matter before us the failure to erect a warning sign
does not appear to have been emphasised - it was described by the
judge as not argued. It is open to think that this was for the
reason that the case was presented on the basis that the gravel
in the intersection area could reasonably have been cleared in
the ordinary way well before the day of the accident. The
accident did not occur in any short intervening period following
a storm during which it would be unreasonable to expect a
clearance to be carried out. The requirement on the Council's
part for reasonable preventative action in such an abridged
period would, had the accident then occurred, no doubt have
concentrated attention on failure to warn rather than failure to
clear. Since the opportunity to clear was so ample in the
present case it became unnecessary to direct attention upon a
failure to warn.
The conclusion that the causative deficiency lay in the
area of design and construction leads back to the conclusion that
the engineers must be regarded as liable also. It is true, as
counsel pointed out on their behalf, that a case was not mounted
against them on the basis of a failure to advise, but as Voli ' s
case shows liability will rest upon them by reason of their
having entered upon the work. Their failure to advise and to
endeavour to persuade their principal means that they must be
regarded as an active agent in the implementation of the design
and in the construction of the work in the form which has been
judged deficient. They should be regarded as the source from
-- 23 of 47 --
4
1 4
which the input of relevant design skills should come, yet they
played a part in the production of a design which was
unnecessarily dependent on the frailty of human effort to
maintain it in a safe condition. The danger inherent in the
design was foreseeable and a different design and small
additional expenditure would have avoided it. This is enough to
render them liable to the plaintiff and would seem to involve the
further consequence that they should not be adjudged entitled to
a full indemnity from their principals. On the other hand, the
Council's policy of limited sealing of streets, a policy which
was known to the engineers, must also be accorded significant
weight when an examination of the causes responsible for the
production of the final work is undertaken. The engineers and
the Council should be held equally responsible. It should be
adjudged that the appeal succeeds against the Council and against
the fourth respondents, the engineers, but it should be dismissed
against the second respondents, the Commission, for the reasons
discussed. I agree with the proposal of Connolly J. to order
that the judgment be dated 13 July, 1989 so that the plaintiff's
just entitlement to interest is met.
-- 24 of 47 --
IN THE SUPREME COURT
OF QUEENSLAND
FULL COURT
No. 2935 of 1979
Before the Full Court
The Chief Justice
Mr. Justice Kelly S.P.J.
Mr. Justice Connolly
BETWEEN :
WAYNE JOSEPH DESMOND
(Plaintiff) Appellant
- and -
MOUNT ISA CITY COUNCIL
(First Defendant) First Respondent
- and -
QUEENSLAND HOUSING COMMISSION
(Second Defendant) Second Respondent
- and -
McINTYRE & ASSOCIATES PTY . LTD,
(Third Defendant) Third Respondent
- and -
JOHN McGILLIVRAY McINTYRE, ANTHONY
O'BRIEN L0U6HNAN. RICHARD GRENVILLE
BARRETT , DAVID HARRY JAMES , JOHN
WILLIAMS , HARRY MIKELSONS and
LEONARD ERIC MOORE
(Fourth Defendants) Fourth Respondents
JUDGMENT - KELLY S.P.J.
Delivered the day of 1990.
CATCHWORDS :
-- 25 of 47 --
2
Counsel :
Solicitors :
C.J.L. Brabazon Q.C. with D.J. McGill for
Appellant
R.R. Douglas Q.C. with P.C. Stephens for First
Respondent
K.F. Boulton for Second Respondent
K.C. Fleming Q.C. & R.M. Stenson for Third
Respondent
J.A. Griffin Q.C. & M.W. Forde for Fourth
Respondents
Barry & Nilsson for Appellant
Quinlan Miller & Treston for First Respondent
Crown Solicitor for Second Respondent
Thynne & McCartney for Third Respondent
Murrell Stephenson for Fourth Respondents
Hearing Dates: 25th, 26th, 30th July, 1990
-- 26 of 47 --
IN THE SUPREME COURT
OF QUEENSLAND
FULL COURT
No. 2935 of 1979
BETWEEN:
WAYNE JOSEPH DESMOND
(Plaintiff) Appellant
- and -
MOUNT ISA CITY COUNCIL
(First Defendant) First Respondent
- and -
QUEENSLAND HOUSING COMMISSION
(Second Defendant) Second Respondent
- and -
MCINTYRE & ASSOCIATES PTY . LTD.
(Third Defendant) Third Respondent
- and -
JOHN McGILLIVRAY McINTYRE. ANTHONY
O'BRIEN LOUGHNAN, RICHARD GRENVILLE
BARRETT . DAVID HARRY JAMES . JOHN
WILLIAMS, HARRY MIKELSONS and
LEONARD ERIC MOORE
(Fourth Defendants) Fourth Respondents
JUDGMENT - KELLY S.P.J.
Delivered the day of 1990.
The facts relevant to this appeal are set out in the reasons
prepared by Connolly J. and it is unnecessary for me to do so.
I agree that for the reasons given by Connolly J. the first
respondent, Mount Isa City Council, is liable to the appellant
so that the appeal against the first respondent should be allowed
and the only aspect with which I propose to deal is whether the
engineers are also liable with the result that the appeal against
the fourth respondents should also be allowed.
-- 27 of 47 --
2
The appellant's case against the engineers as pleaded was
that they had been negligent in designing, constructing and
supervising the construction of the works, but in the way in
which the case was conducted at the trial the essential
allegation was one of negligence in design. An application to
amend the statement of claim to allege negligence in giving
advice to the Council was not granted. It follows from Voli v.
Inglewood Shire Council (1962-1963) 110 C.L.R. 74, at p. 85, that
by reason of their having entered upon the work the engineers
owed a duty of care to the appellant and, if the design were
negligent and injury to the appellant resulted from such
negligence, the engineers would be liable to him.
Applying then the tests set out in Wyonq Shire Council v.
Shirt (1979-1980) 146 C.L.R. 40, at p. 47, it is first necessary
to ask whether a reasonable man in the position of the engineers
would have foreseen that his conduct involved a risk of injury
to the appellant or to a class of persons including the
appellant. This involves the question of whether a reasonable
man in the position of the engineers would have foreseen that the
design which they produced might lead to a risk of injury to a
person entering upon the intersection by reason of the fact that
its implementation might result in a build up of gravel at the
intersection after heavy rain.
The learned trial judge found that the system was properly
designed as a stormwater drainage system but he also found that
the system as designed and constructed did not prevent a build
up of gravel at the intersection after heavy rain. The learned
judge further found that it should have been known to the
-- 28 of 47 --
3
engineers that there would have been some accumulation of gravel
at the intersection even in a one in five year storm and that
there would have been at least 50 per cent more gravel in a one
in 20 year storm.
Mr. McIntyre, one of the fourth respondents and the senior
partner of the firm concerned who was involved in the detailed
work of engineering design, was .aware of the Council's policy
that after rain it would clean up significant gravel deposits at
street intersections and wherever they occurred on a road. He
said that to the best of his recollection this had been happening
in the early 1970s and it was assumed that the instruction to do
this would be carried out. It would appear that the learned
trial judge accepted that the system was designed having regard
to this.
Mr. Astill, an experienced consulting engineer, said in
evidence that it was good design practice to design on the
assumption that there is going to be proper maintenance, that is,
effective maintenance in all respects at all times, and that he
did not think that any engineer could design on the basis that
things were not always going to be properly maintained and not
always working perfectly. It would appear that the learned trial
judge also accepted this evidence.
In my opinion the engineers were entitled to design on the
basis which they did, being aware of the Council's maintenance
policy to which effect was being given and to assume that this
would continue to be the case with the result that any
significant quantity of gravel which may be deposited at the
intersection after heavy rain would be cleaned up. That being
-- 29 of 47 --
4
so, turning to the test in Wvonq Shire Council v. Shirt (supra)
to which I have referred, a reasonable man in the position of the
engineers would not have foreseen that the design which they
produced might lead to a risk of injury to a person in the
position of the appellant entering upon the intersection by
reason of the fact that implementation of that design might lead
to a build up of gravel at the intersection after heavy rain.
That being so, no breach of the duty of care owed by the
engineers has been made out.
Consequently in my view liability on the part of the
engineers has not been established and I would not consider that
anything said by Dixon J., as he then was, in Buckle v. Bavswater
Road Board (1936) 57 C.L.R. 259 should lead to any other
conclusion. The appeal against the fourth respondents should
therefore be dismissed.
I agree that for the reasons given by Connolly J. the
appellant is not entitled to relief against the second
respondent, Queensland Housing Commission. The appeal against
the third respondent was dismissed by consent at the hearing of
the appeal. I also agree that an order should be made pursuant
to 0. 44 r. 2 that the judgment be dated 13th July, 1989.
-- 30 of 47 --
IN THE SUPREME COURT
OF QUEENSLAND
FULL COURT
No. 2935 of 1979
Before the Full Court
The Chief Justice
Mr. Justice Kelly S.P.J.
Mr. Justice Connolly
BETWEEN:
WAYNE JOSEPH DESMOND
(Plaintiff) Appellant
- and -
MOUNT ISA CITY COUNCIL
(First Defendant) First Respondent
- and -
QUEENSLAND HOUSING COMMISSION
(Second Defendant) Second Respondent
- and -
MCINTYRE & ASSOCIATES PTY , LTD.
(Third Defendant) Third Respondent
- and -
JOHN McGILLIVRAY McINTYRE. ANTHONY
O'BRIEN LOUGHNAN. RICHARD GRENVILLE
BARRETT , DAVID HARRY JAMES . JOHN
WILLIAMS, HARRY MIKELSONS and
LEONARD ERIC MOORE
(Fourth Defendants) Fourth Respondents
JUDGMENT - CONNOLLY J.
Delivered the 6th day of September, 1990.
CATCHWORDS :
-- 31 of 47 --
2
Counsel :
Solicitors :
C.J.L. Brabazon Q.C. with D.J. McGill for
Appellant
R.R. Douglas Q.C. with P.C. Stephens for First
Respondent
K.F. Boulton for Second Respondent
K.C. Fleming
Respondent
Q.C. & R.M. Stenson for Third
J.A. Griffin
Respondents
Q.C. & M.W. Forde for Fourth
Barry & Nilsson for Appellant
Quinlan Miller & Treston for First Respondent
Crown Solicitor for Second Respondent
Thynne & McCartney for Third Respondent
Murrell Stephenson for Fourth Respondents
Hearing Dates: 25th, 26th, 30th July, 1990
-- 32 of 47 --
IN THE SUPREME COURT
OF QUEENSLAND
No. 2935 of 1979
BETWEEN :
AND:
AND:
AND:
WAYNE JOSEPH DESMOND
(Plaintiff) Appellant
MOUNT ISA CITY COUNCIL First
(First Defendant) Respondent
QUEENSLAND HOUSING COMMISSION
(Second Defendant) Respondent
McINTYRE & ASSOCIATES PTY ■ LTD.
(Third Defendant)
Third
Respondent
AND:
JOHN McGILLIVRAY McINTYRE, ANTHONY
O'BRIEN LOUGHNAN, RICHARD GRENVILLE
BARRETT, DAVID HARRY JAMES, JOHN
WILLIAMS, HARRY MIKELSONS and LEONARD
ERIC MOORE Fourth
(Fourth Defendants) Respondents
JUDGMENT - CONNOLLY J.
Delivered the day of 1990
At about 11.30p.m. on 6th April, 1977 the plaintiff was
riding a motor cycle in a northerly direction down Park Avenue,
Mount Isa intending to turn to his right into Delacour Drive.
As he commenced his turn he came into a deposit of gravel on the
bitumen surface. It has been found that he lost control of the
motor cycle, fell off and sustained serious injury. He brought
this action for damages against Mount Isa City Council as the
highway authority, alleging negligence in the design,
-- 33 of 47 --
2
construction and maintenance of the relevant part of the road
system. The other defendants were Queensland Housing Commission,
on behalf of which the intersection of Park Avenue and Delacour
Drive was constructed and the engineers who designed and
supervised the construction of the work. It will be convenient
to deal first with the position of the Council.
The allegations against the Council were variously stated
but essentially they are two in number :-
(i) the Council is charged with vicarious liability for the
design and construction on the footing that the design was
such that any rain would be likely to cause a build up of
gravel in the intersection;
(ii) the Council was further charged with failing to remove the
gravel which had been deposited on the intersection before
6th April, 1977 and with failing to erect a sign warning of
the danger of gravel on the intersection.
The learned trial judge, in a conspicuously careful
judgment, identified the issues of law and fact and made findings
on all relevant issues of fact, very few of which, if any, were
questioned on the hearing of this appeal. He declined to find
contributory negligence against the plaintiff. He found the
plaintiff's damages in the sum of $750,335.50. His Honour held
that the storm water drainage system was so designed that the
accumulation of gravel on the intersection should be been
foreseen by ' those who designed it but that it was not in fact
taken into account. His Honour found that the complaints made
by the plaintiff about the storm water drainage system were, in
their essentials, made out. Thus His Honour was satisfied that
-- 34 of 47 --
3
the system as designed and constructed did not prevent a build
up of gravel at the intersection after heavy rain; that provision
was not made in the system as designed or constructed for
trapping or carrying away from the intersection gravel likely to
be washed onto it; that provision was not made to ensure that
heavy rain would not cause a build up of large quantities of
gravel in the intersection; that the defendants knew or ought to
have known that the fabric of the footpath (by which I take his
Honour to mean the eastern footpath of the Park Avenue to which
I shall refer later) comprised loose gravel so located in
relation to the intersection that it could be washed in large
quantities by heavy rain into the intersection; and finally that
it was likely that heavy rain would cause a build up of large
quantities of gravel in the intersection. His Honour however
held that there was no breach of any duty of care owed to the
plaintiff by any of the defendants and dismissed the action.
The intersection came into existence as part of the road
works of a new estate being part of stage one of Pioneer Estate.
The development comprised the land to the north of Joyce Street
and the estate road works ran from the junction of Joyce Street
and Park Avenue, which was included so as to include the part of
Park Avenue to the north of that junction together with Delacour
Drive including what has been called the intersection of Delacour
Drive and Park Avenue. All of the road system within Pioneer
Estate had curbing and channelling and the carriage way was
sealed from curb to curb. Park Avenue which seemed to have been
an existing road in T969, when this development was embarked
upon, was neither sealed nor provided with curb and channel. In
-- 35 of 47 --
4
common with much of the city of Mount Isa, the top soil was a
reddish gravel, easily dislodged by storm water.
It is relevant to mention that the Council, be aware of
shortage of accommodation in the city, had interested the Housing
Commission in developing the estate which would seem to have been
Crown Land. Mount Isa in 1969 was undergoing considerable
expansion and the resources of the Council were somewhat
strained. Because of the nature of the top soil the Council was
doing its best to provide limited sealing of the unmade road
system so as to minimise the discomfort caused by dust but it had
not been able to do better than provide 18 foot bitumen strips
along the centre of roads such as Park Avenue. Park Avenue was
wholly unmade but the decision was taken, as a consequence of the
impending Pioneer Estate development to provide an 18 foot strip
of bitumen from Marian Street to the south and connecting with
the Park Avenue and Joyce Street junction where Park Avenue ran
into the fully sealed, curbed and channelled road system of the
new estate. The scheme thus envisaged Park Avenue south of the
Joyce Street junction having natural gravel shoulders and table
drains but no curbing or channelling.
The fall of the land along Park Avenue was from south to.
north. The learned Judge has found that Park Avenue carried the
run off from .an area of up to 3.2 acres in all. He has also
found that the gravel which accumulated in the intersection where
the appellant sustained his injuries came largely from the
eastern side of Park Avenue. The quantity of gravel was by no
means negligible. It was up to two to three inches deep in the
worst places and had a total volume of two cubic metres. It
-- 36 of 47 --
5
abutted against the northern curb of Delacour Drive and covered
almost the full width of Delacour Drive at the south eastern
corner of the intersection.
The engineers were retained in December 1970 by the Housing
Commission which was of course the principal for the Pioneer
Estate road works . As a matter of convenience it was arranged
between the Council and the Commission that the Commission should
include in their contract the provision of the bitumen strip to
the southern end of Park Avenue, doing so on behalf of the
Council which ultimately paid for it. It is clear however that
in all relevant respects, the road works were designed to the
requirements of the Council. The Council was the local authority
which alone could approve sub-division and it was, as is not
disputed, the highway authority. The engineers, although civil
engineers in private practice, had acted as city engineers,
having been the Council's consultants since 1963. The road works
in question were completed in March, 1973 and the roads were open
to the public a few months later.
It is not profitable to examine all the issues which had
been raised amongst the various parties, most of which are not
now pursued. The main complaint against the engineers, stated
in broad terms, is that they under-designed the stormwater
drainage system, which they designed to carry off the volume to
be expected in a storm of one in five years frequency. This
means simply that the run off would be contained within the
drainage system for storms up to such a frequency but that it
would not contain the run off for larger storms. At the end of
the day, no real criticism is levelled at this approach.
-- 37 of 47 --
6
Obviously it means that from time to time a storm water drainage
system will not contain the run off but the disadvantages which
ensue are regarded as acceptable and are, in most cases, short
lived. The learned trial Judge has found that the adoption of
a one in five years storm water situation was appropriate for the
design and that the design was in fact satisfactory for the storm
water run off so postulated. It is clear however that his Honour
recognised that to the designing engineer the function of the
storm water drainage system is to carry water and not primarily
gravel although, of the nature of things, some gravel will be
carried with the water.
The gravel in question was deposited as the result of a
storm on 21st March, 1977 which was of particular intensity. It
has in fact been estimated as having a frequency of one in 50
years. It is obvious therefore that only a major departure from
the design assumptions could have been expected to cope with
run-off of such intensity and, in practical terms, this could not
be called for.
The Council's officers and the engineers were, however,
aware of the probability that in major storms significant
quantities of gravel were likely to be washed downhill and to
come to rest when the velocity of the waters abated, as will
occur when water ponds in the vicinity of inlets to the drainage
system when that system becomes filled to capacity. So far as
the present problem is concerned the plaintiff contended, again
in broad terms, for one of three solutions. First it was argued
for him that the whole of Park Avenue back to Marian Street
should have been sealed and curbed and channelled. This, the
-- 38 of 47 --
7
learned Judge has found, would have done much to obviate or at
least minimise the deposition of gravel in the intersection with
Delacour Drive. This is true enough but it would not have
obviated the problem entirely for Park Avenue was not the only
source of water borne gravel to this intersection, some at least
coming off the caravan park to the south east. However the
Council's main response to this suggestion was that the
intersection in question was not the only part of the Mount Isa
road system at which this sort of problem occurred after storms
and that it was not even the worst. His Honour has found that
there were many areas in Mount Isa where the deposition of gravel
after heavy rain exceeded that at the intersection of Park Avenue
and Delacour Drive. The Council had limited budgetary resources
and its policy was to provide the 18 foot bitumen strip without
curb and channel as being the most practicable approach to
improving the amenity of its area within the limits of its
budgetary constraints.
Now the learned trial Judge reached the conclusion that the
only way in which the accumulation of gravel could have been
avoided was through the measure which was eventually adopted in
1979, namely the installation of full width sealing of Park
Avenue with curbing and channelling. His Honour said that the
accumulation was not attributable to any fault in the design and
construction of the drainage system but resulted from the design
and construction of Park Avenue between Marian Street and Joyce
Street. The design for Park Avenue reflected the policy of the
Council in a situation in which something like 8.5 per cent of
the road surfaces of Mount Isa had any bitumen on them. His
-- 39 of 47 --
8
Honour, rightly in my opinion, concluded that the decision of the
Council to lay down bitumen strips and gradually to improve the
roads as finance became available is to be regarded as a policy
decision, one involving a choice by a public authority as to the
allocation of limited funds. He recognised however that the fact
that the Council's decision was based upon policy grounds would
not provide any immunity to it if it acted negligently in a
particular case. It might, as his Honour said, be invoked as a
ground why a public authority should not act that it could not
afford an excuse for negligent action.
There was evidence before his Honour, if evidence on the
point were needed, that gravel on paved roads is dangerous,
particularly on roads obviously constructed to a particular
standard where the driver does not expect a hazard of that type.
This is not the case of one of the obviously numerous unpaved
roads in the Mount Isa area. Park Avenue provided access from
the south to a new sub-division with a fully developed road
system. Indeed from Joyce Street to Delacour Drive, Park Avenue
itself was a fully developed modern road. An accumulation of two
cubic yards of loose gravel on a fully paved intersection is a
hazard which would not be expected by users of the highway
although, as his Honour found, it was expected by those who
designed and constructed the road system. It accumulated where
it did because the downward gradient tended to flatten out at the
intersection where inlets were located, causing ponding of the
storm water carried down Park Avenue and consequential deposition
of the gravel.
-- 40 of 47 --
9
The argument for the Council tended to treat this problem
as simply one of numerous cases of accumulation of gravel
throughout its area. It seems to me however that it is not right
to regard the responsibility of the Council as limited to the
bitumen strip it constructed in Park Avenue outside stage one of
the Pioneer Estate. What should be regarded is the entirety of
the works constructed to its requirements from Marian Street to
Delacour Drive. So regarded this is not a case simply of a
highway authority failing to perform additional work on the
shoulders of a road it has constructed and failing to provide it
with curbing and channelling. Rather is it a case of an
authority which has caused a system of road works to be
constructed which must result in a dangerous situation occurring
after heavy rain. If this be the correct approach it seems to
me that it is no answer to say that other dangerous situations
occur in its area. Most of these, having regard to the
proportion of unmade roads . to which I referred earlier, will
amount to no more than its failure to upgrade the road system
which, as a broad statement, will amount to nonfeasance on its
part. If there are other cases in which the hazard is the
product of works which it has either constructed or the
construction of which it has required then, in my judgment, it
cannot claim the immunity from responsibility for inaction which
is enjoyed by highway authorities.
In Buckle v. Bayswater Road Board (1936) 57 C.L.R. 259
Dixon J. as he then was said, at p. 282, of a road authority:
"It must decide upon what road work it will expend the
funds available for the purpose, what are the needs of
the various streets and how to meet them. A failure
to act, to whatever it may be ascribed, cannot give a
-- 41 of 47 --
10
cause of action. No civil liability arises from an
omission on its part to construct a road, to maintain
a road which it has constructed, to repair a road
which it has allowed to fall into disrepair, or to
exercise any other power belonging to it as a highway
authority."
At p. 283 however his Honour qualified the apparent
generality of that statement as follows:
"But while a road authority owes to the members of the
public using a highway no duty to undertake active
measures whether of maintenance, repair, construction
or lighting in order to safeguard them from its
condition, on the other hand it possesses no immunity
from liability for civil wrong. It is, of course, a
civil wrong to cause particular damage by obstructing
a highway, or by making it unsafe or dangerous.
Interferences with a highway which in themselves would
be unlawful in a stranger are as a rule authorized
acts when done by a road authority. But a road
authority in doing them must take due care for the
safety of those using the highway and is not protected
if it creates dangers which reasonable care and skill
could avoid."
This is not a simple case of a highway authority failing to
form a road. It is, on the contrary, a case in which a local
authority has permitted sub-division on the basis of a road
layout which inevitably had the dangerous features which
materialised in this case unless it either sealed, curbed and
channelled the eastern part of Park Avenue or took appropriate
steps by warning the public and cleaning the road as early as
practicable to guard against the hazard. The case is as it seems
to me within the words of Dixon J. in Buckle at p. 284:
"It is evident that even if what otherwise might be an
obstruction or danger is created on the highway, it
may be made relatively harmless by the use of some
additional precaution, such as guarding or lighting.
If the precaution is discontinued, consequences may
ensue which up to that time had been intercepted. For
these consequences the road authority will be liable
in damages ."
-- 42 of 47 --
The following passage from the judgment of Mason J., as he
then was, in Sutherland Shire Council v. Hevman (1985) 157 C.L.R.
424 at pp. 459-60 is in point :-
"Generally speaking, a public authority which is under
no statutory obligation to exercise a power comes
under no common law duty of care to do so: see Revesz
v. The Commonwealth (1951) 51 S.R. (N.S.W.) 63. But
an authority may by its conduct place itself in such
a position that it attracts a duty of care which calls
for exercise of the power. A common illustration is
provided by the cases in'which an authority in the
exercise of its functions has created a danger,
thereby subjecting itself to a duty of care for the
safety of others which must be discharged by an
exercise of its statutory powers or by giving a
warning: see, e.g. Barnes v. Irwell Valley Water
Board [1939] 1 K.B. 21; Knight v. Sheffield
Corporation [1942] 2 All E.R. 411; Fisher v. Ruislip-
Northwood Urban District Council [1945] K.B. 584; Bird
v. Pearce; Ex parte Somerset County Council (1979) 77
L.G.R. 753. That it is the conduct of the authority
in creating the danger that attracts the duty of care
is demonstrated by Sheppard v. Glossop Corporation
[1921] 3 K.B. 132. There the highway authority was
under no duty of care with respect to lighting, though
the danger was foreseeable, because it did not create
the danger. Having statutory power to make provision
for the lighting of streets, it placed a lamp at a
dangerous point in a street, the danger not being of
its making, but extinguished the lamp at 9.00 p.m. in
accordance with a general resolution applying to all
streets in the borough. The authority was held not
liable on the footing that the statute imposed no
obligation to light, that the authority having begun
to light was under no obligation to continue to do so,
and that having done nothing to make the street
dangerous, it was under no obligation to give warning
of the danger. Atkin L.J. [1921] 3 K.B., at p. 151
explained earlier cases in which under the same
statute local authorities had been liable for not
lighting by stating that the local authorities had
created . the dangers which were responsible for the
plaintiffs' injuries."
The learned trial Judge considered that there had been no
breach of the duty of care owed by the Council as the highway
authority in this case. The existence of the duty is not open
to question, a highway authority obviously owing a duty of care
to users of the highway. His Honour in considering whether there
-- 43 of 47 --
12
had been a breach of the duty referred to the judgment of Mason
J. as he then was in Wvonq Shire Council v. Shirt (1980) 146
C.L.R. 40 at p. 47 where his Honour said that the perception of
the reasonable man's response to a perceived risk of injury to
those to whom the duty is owed calls for a consideration of the
magnitude of the risk and the degree of probability of its
occurrence along with the expense, difficulty and inconvenience
of taking alleviating action and any other conflicting
responsibilities which the defendant may have.
His Honour expressed the view that the magnitude of the risk
of injury occurring as it did could properly be assessed as
slight. With profound respect I am unable to agree with this
assessment. It is based on the fact that there had been no
reported previous accident through slipping or skidding in
gravel. His Honour agreed that it was not merely fanciful or
remote but the appearance presented by the gravel in a photograph
in the record which was taken not long after the accident
suggests to me that it is simply good fortune that no such
accident had occurred previously. Cf. Webb v. South Australia
(1982) 56 A.L.J.R. 912 at p. 913.
As to the expense of taking alleviating action, the learned
Judge confines himself to the sealing of the eastern side of Park
Avenue. He considered that the expense of making that
improvement could not be isolated from the expense of
implementing a decision to provide such improvements wherever
they were warranted throughout the town. With great respect I
am unable to accept that approach. I repeat that this is a case
in which the local authority, with full knowledge of the
-- 44 of 47 --
13
likelihood that the intersection would be made hazardous by the
accumulation of gravel after heavy rain, failed to perceive its
duty to respond to a situation of its own making. It is no
answer to this to say that had it sealed the eastern side of Park
Avenue it would have provided conditions superior to those
provided in other streets which had in equal or higher claim to
be curbed and channelled in the interests of the safety of the
community. If the same legal situation obtained in the other
locations then it had the same duty to act. Of course if the
legal situation was not the same the consideration to which the
learned Judge adverted is irrelevant. Finally his Honour
considered that the Council's conflicting responsibilities to the
residents of Mount Isa, which had led to the adoption of its
policy to confine road making to bitumen strips, meant that there
had been no breech of its duty of care. The answer to this seems
to me, with respect, to lie in what I have said in relation to
expense.
The Council then, having required the construction of the
intersection in a way which was potentially hazardous, was under
an obligation to take reasonable steps at least to minimise the
hazard. This it might have done by sealing the eastern side of
Park Avenue and by a system of warning coupled with timely
removal of the gravel. It would seem to have chose the latter,
though limiting its operations to clean-up without warning. As
to clean-up, his Honour considered that the case was one where
there was a failure to maintain a road surface which had been
properly constructed and held that such a failure is not
actionable. With all respect, this view is answered by the
-- 45 of 47 --
passage from Buckle at p. 284 to which I referred earlier. The
potential danger of the road system as constructed might have
been made relatively harmless by guarding or lighting until the
obstructing material could be removed. It was indeed
contemplated by the designing engineers that the inevitable
accumulation of gravel would be removed by the local authority's
road maintenance service. If that had been done promptly the
danger would have been obviated and warning devices such as signs
or lights could have been employed as interim measures. In the
event this obstruction remained in the intersection without any
warning device for 17 days before the plaintiff sustained his
injuries .
In my judgment the plaintiff's appeal against the Council
should be allowed and there should be judgment for the plaintiff
against the Council for damages found by the learned trial Judge.
So far as the other respondents are concerned I am of the opinion
that the findings of the learned Judge mean that the design was
satisfactory for their purpose which, relevantly, was the
disposal of storm water. The likelihood of gravel finding its
way onto the intersection was obvious enough but all road
surfaces are likely to be made unsafe by the accumulation of
debris unless it is constantly removed. The designing engineers
could not have provided for the sealing of the surface of Park
Avenue contrary to the policy of the Council for the evidence is
that the Council would not have paid for the work. Their
position cannot, in my opinion, be compared with that of the
architects in Voli v. Inglewood Shire Council (1963) 110 C.L.R.
74, which was a case of a structural defect in a building which
-- 46 of 47 --
15
therefore remained potentially dangerous whenever it was
substantially filled by spectators, there being no steps open to
the owner and occupier to obviate the hazard. The architects in
Voli had not under-designed in reliance on their principal's
limiting the use of the structure in a manner or to an extent
which would have made it safe. They had simply incorporated a
faulty member in the building. Here, on the contrary, the
engineers were entitled to rely on timely and efficient clean-up
and on proper setting up of warning devices had experience showed
this to be necessary. As to the Housing Commission, it caused
to be constructed, upon what was at that stage its own land, a
road system and storm water drainage system which were adequate
for their purposes and only liable to become dangerous if the
Council failed to discharge its own responsibility. I do not
think that the plaintiff is entitled to relief against the
respondents other than the Council.
Counsel for the appellant submitted that an adjustment of
interest is called for having regard to the fact that the
appellant has been deprived since 13 July, 1989 of a very large
judgment. In my opinion, justice will be done if the Court
orders pursuant to 0. 44 r. 2 that the judgment be dated 13 July,
1989 so that interest will run on it from that date under s. 73
of the Common Law Practice Act.
-- 47 of 47 --
Official source: https://www.sclqld.org.au/caselaw/QSCFC/1990/064