Fischer & Ors v Body Corporate for Centre Point Community Title Scheme 7779 [2004] QDC 17
DISTRICT COURT OF QUEENSLAND
CITATION: Fischer & Ors v Body Corporate for Centre Point
Community Title Scheme 7779 [2004] QDC 017
PARTIES: WARREN FISCHER
First Applicant
v
BODY CORPORATE FOR CENTRE POINT
COMMUNITY TITLE SCHEME 7779
Respondent
FILE NO: BD 391
DIVISION: Civil Jurisdiction
PROCEEDING:
ORIGINATING
COURT: District Court Brisbane
DELIVERED ON: 13 February 2004
DELIVERED AT: Brisbane
HEARING DATE: 28 and 29 January 2004
JUDGE: Samios DCJ
ORDER: Application dismissed
CATCHWORDS: HOME AND COMMERCIAL UNITS - Body Corporate and
Community Management Act 1997 - Application under s
48(1) for adjustment of contribution schedule lot entitlement
– whether should be adjusted - whether it should be equal or
something else in order to be ‘just and equitable’ –
application dismissed in favour of long standing status quo
Body Corporate and Community Management Act 1997
s46,47,48,49
Building Units and Group Titles Act 1980
Ciriello v Panitz Centre Building Units Plan 3894 (1999) 20
Qld Lawyer Rep 138
Re: Kurilpa Protestant Hall Pty Ltd (1946) St R Qd 170
Burnitt Investments Pty Ltd v Body Corporate St Andrews
Community Titles Scheme 20508 (2002) QDC 6
Sandhurst Trustees Limited Ltd (ACN 004030737) v Condah
Bay Investments Pty Ltd (ACN 050 287 206) & Ors (2003)
QDC 438
-- 1 of 28 --
2
COUNSEL: Mr Atkinson for the applicants
Mr Perry for the respondent
SOLICITORS: Kinneally Miley for the applicants
Quinn & Scattini for the respondent
[1] This is an application pursuant to section 48(1)(a) of the Body Corporate and
Community Management Act 1997 (the Act) for an order for the adjustment of the
contribution schedule lot entitlement in the Body corporate Centrepoint Community
Title Scheme 7779 (the Scheme).
[2] The applicants are ten in number (the applicants)and are the registered owners of an
estate in fee simple in ten lots in the Body corporate for the Scheme. There are fifty
one lots in the Scheme. The Scheme land is situated at 69 Leichhardt Street, Spring
Hill.
[3] The Scheme was created upon registration of Building Units Plan No 7474 on 15
August 1986.
[4] The building on the Scheme land consists of three levels for covered car parking
and ancillary purposes. The bottom level is a half floor only. The car parking
spaces are on the title of each lot. There are two towers. Tower Block “A” consists
of a common area on the ground floor (facilities include pool, games room and
reception) and an additional seven levels of residential lots and Tower Block “B”
consists of seven levels of residential lots. There is one lift shaft in each tower.
There are gardens and grounds that contain an outdoor swimming pool. The
residential lots contain “central” air conditioning drawing on common property
resources supplying chilled water.
-- 2 of 28 --
3
[5] It is convenient to reproduce a profile diagram of the two towers and the lots within
the two towers:-
Building Units and Group Titles Act 1980
BUILDING UNITS AND GROUP TITLES REGULATIONS 1980
(Form 9)
Regulation 8(1)
CENTREPOINT Sheet No. 18 of 18 Sheets
BUILDING UNITS PLAN NO. 7474
PROFILE DIAGRAM
TOWER BLOCK ‘A’_ TOWER_BLQCK B
K UNITS 50,51
J UNITS 48,49 UNITS 28,29,30,31
UNITS 46, 47 UNITS 24,25,26,27
H UNITS 44, 45 UNfTS 20,21,22,23
G UNITS 40,4/, ,2,43 UNITS 15,16,17,18,19
F UNlTs 36 37 38.39 UNITS 10,11,12 13 14
E UNITS 32,33,34,35 UNITS 5, \:., 7, 8,9
D COMMON UNITS I 2 3. 4
C GARAGES
B GARAGES
A GARAGES
Scale: 1: 400
-- 3 of 28 --
4
[6] All the lots within the Scheme are used for residential purposes.
[7] The schedule of lot entitlement allocation for the Scheme was prepared by or on
behalf of the original owner prior to the registration of the Building Units Plan.
That schedule was prepared in accordance with the Building Units and Group Titles
Act 1980 (the 1980 Act). Under the 1980 Act there was only one schedule of
entitlements.
[8] The Act commenced on 13 July 1997 replacing the 1980 Act. The Act established
two schedules (interest schedule and contribution schedule) in place of the single lot
entitlement schedule.
[9] For all existing strata developments at 13 July 1997 the Act required the
entitlements for each lot in a scheme under the two new schedules to be the same as
the entitlements in the single schedule under the 1980 Act. The Scheme currently
has an identical interest and contribution schedule.
[10] Sections 46, 47, 48 and 49 of the Act provide as follows:-
“46 Lot entitlements
(1) A “lot entitlement”, for a lot included in a community titles
scheme, means the number allocated to the lot in the contribution
schedule or interest schedule in the community management
statement.
(2) The “contribution schedule” is the schedule in a community
management statement containing each lot’s contribution schedule
lot entitlement.
(3) The “interest schedule” is the schedule in a community
management statement containing each lot’s interest schedule lot
entitlement.
(4) The “contribution schedule lot entitlement”, for a lot,
means the number allocated to the lot in the contribution schedule.
-- 4 of 28 --
5
(5) The “interest schedule lot entitlement”, for a lot, means the
number allocated to the lot in the interest schedule.
(6) A lot entitlement must be a whole number, but must not be 0.
(7) For the contribution schedule for a scheme for which
development approval is given after the commencement of this
subsection, the respective lot entitlements must be equal, except to
the extent to which it is just and equitable in the circumstances for
them not to be equal.
Examples for subsection (7) of circumstances in which it may be just and equitable
for lot entitlements not to be equal—
1. A layered arrangement of community titles schemes, the lots of which have
different uses (including, for example, car parking, commercial, hotel and
residential uses) and different requirements for public access, maintenance
or insurance.
2. A commercial community titles scheme in which the owner of 1 lot uses a
larger volume of water or conducts a more dangerous or a higher risk
industry than the owners of the other lots.
(8) In deciding the contribution schedule lot entitlements and
interest schedule lot entitlements for a scheme mentioned in
subsection (7), regard must be had to—
(a) how the scheme is structured; and
(b) the nature, features and characteristics of the lots included
in the scheme; and
(c) the purposes for which the lots are used.
(9) A change to a lot entitlement takes effect on the recording of
a new community management statement incorporating the change.
“47 Application of lot entitlements
(1) This section states the general principles for the application of
lot entitlements to a community titles scheme, but has effect subject
to provisions of this Act providing more specifically for the
application of lot entitlements.
(2) The contribution schedule lot entitlement for a lot is the basis
for calculating—
(a) the lot owner’s share of amounts levied by the body
corporate, unless the extent of the lot owner’s obligation to
contribute to a levy for a particular purpose is specifically
otherwise provided for in this Act;12 and
-- 5 of 28 --
6
(b) the value of the lot owner’s vote for voting on an ordinary
resolution if a poll is conducted for voting on the
resolution.
(3) The interest schedule lot entitlement for a lot is the basis for
calculating—
(a) the lot owner’s share of common property; and
(b) the lot owner’s interest on termination of the scheme,
including the lot owner’s share in body corporate assets on
termination of the scheme; and
(c) the unimproved value of the lot, for the purpose of a
charge, levy, rate or tax that is payable directly to a local
government, the commissioner of land tax or other
authority and that is calculated and imposed on the basis of
unimproved value.
(4) Neither the contribution schedule lot entitlement nor the
interest schedule lot entitlement for a lot is used for the calculation
of the liability of the owner or occupier of the lot for the supply of a
utility service to the lot if the amount of the utility service supplied
to each lot is capable of separate measurement, and the owner or
occupier is billed directly.
“48 Adjustment of lot entitlement schedule
(1) The owner of a lot in a community titles scheme may apply—
(a) to the District Court for an order for the adjustment of a lot
entitlement schedule; or
(b) under chapter 6, for an order of a specialist adjudicator for
the adjustment of a lot entitlement schedule.
(2) Despite any other law or statutory instrument—
(a) the respondent for an application mentioned in subsection
(1) is the body corporate; and
(b) at the election of another owner of a lot in the scheme, the
other owner may be joined as a respondent for the
application; and
(c) each party to the application is responsible for the party’s
own costs of the application.
(3) An owner who elects, under subsection (2)(b), to become a
respondent for the application must give written notice of the
election to the body corporate.
-- 6 of 28 --
7
(4) The order of the court or specialist adjudicator must be
consistent with—
(a) if the order is about the contribution schedule—the
principle stated in subsection (5); or
(b) if the order is about the interest schedule—the principle
stated in subsection (6).
(5) For the contribution schedule, the respective lot entitlements
should be equal, except to the extent to which it is just and equitable
in the circumstances for them not to be equal.
(6) For the interest schedule, the respective lot entitlements
should reflect the respective market values of the lots included in
the scheme when the court or specialist adjudicator makes the order,
except to the extent to which it is just and equitable in the
circumstances for the individual lot entitlements to reflect other
than the respective market values of the lots.
(7) If a lot mentioned in subsection (6) is a subsidiary scheme,
the market value of the lot is the market value of the scheme land for
the subsidiary scheme.
(8) For establishing the market value of a lot created under a
standard format plan of subdivision, buildings and improvements on
the lot are to be disregarded.
(9) If the court or specialist adjudicator orders an adjustment of a
lot entitlement schedule, the body corporate must, as quickly as
practicable, lodge a request to record a new community management
statement reflecting the adjustment ordered. Maximum penalty for
subsection (9)—100 penalty units.
“49 Criteria for deciding just and equitable circumstances
(1) This section applies if an application is made for an order of
the District Court or a specialist adjudicator for the adjustment of a
lot entitlement schedule.
(2) This section sets out matters to which the court or specialist
adjudicator may, and may not, have regard for deciding—
(a) for a contribution schedule—if it is just and equitable in the
circumstances for the respective lot entitlements not to be
equal; and
(b) for an interest schedule—if it is just and equitable in the
circumstances for the individual lot entitlements to reflect
other than the respective market values of the lots.
-- 7 of 28 --
8
(3) However, the matters the court or specialist adjudicator may
have regard to for deciding a matter mentioned in subsection (2) are
not limited to the matters stated in this section.
(4) The court or specialist adjudicator may have regard to—
(a) how the community titles scheme is structured; and
(b) the nature, features and characteristics of the lots included
in the scheme; and
(c) the purposes for which the lots are used.
(5) The court or specialist adjudicator may not have regard to any
knowledge or understanding the applicant had, or any lack of
knowledge or misunderstanding on the part of the applicant, at the
relevant time, about—
(a) the lot entitlement for the subject lot or other lots included
in the community titles scheme; or
(b) the purpose for which a lot entitlement is used.
(6) In this section—
“relevant time” means the time the applicant entered into a contract
to buy the subject lot.
“subject lot” means the lot owned by the applicant.”
[11] The relevance of the contribution schedule lot entitlement for a lot in this
application is that it is the basis for calculating the lot owner’s share of amounts
levied by the Body corporate and the value of the lot owner’s vote for voting on an
ordinary resolution if a poll is conducted for voting on the resolution (s 47(2)(a) and
(b)).
[12] Prior to the commencement of these proceedings the first applicant (Mr Fischer)
commissioned a report from Stewart Silver King & Burns Strata Management
(SSKB). The report from SSKB concluded that, although it was just and equitable
for the contributions not to be equal, the existing lot entitlement contributions
-- 8 of 28 --
9
schedule was not just and equitable. The SSKB report contained a recommendation
for a fair and equitable contribution schedule of lot entitlements for the Scheme.
[13] At an extraordinary general meeting of the Body corporate for the Scheme on 24
June 2002 the first applicant moved that the Body corporate adopt the
recommendation contained in the SSKB report. The voting on the motion which
was conducted in an open ballot was nine in favour, twenty-one against and four
abstaining. The first applicant re-submitted the motion to adopt the new community
management statement in accordance with the recommendations contained in the
SSKB report again on 18 November 2002. On that occasion the motion was
defeated in an open ballot there being ten in favour, fifteen against and five
abstaining.
[14] Mr Fischer, one of the applicants, states he and the applicants have exhausted all
avenues available to them to implement a change to the existing contribution
schedule without recourse to the Court. Further, he honestly and truly believes that
the existing contribution schedule of lot entitlements is inequitable and unfair and
that the contributions schedule of lot entitlements proposed in the SSKB report will
rectify the inequity and unfairness of the existing schedule.
[15] The application is opposed by the Body corporate which is by virtue of s 48(2)(a) of
the Act the respondent for the application. Further, five lot owners have sworn
affidavits in support of their opposition to the application and gave evidence and
were cross-examined on the hearing of this application.
[16] The author of the SSKB report is Mr Sheehan. When he gave evidence he said that
his report was basically a cost allocation exercise. It proceeded on the basis that
-- 9 of 28 --
10
each of the lots should have a contribution lot entitlement which equates to the cost
that lot is either causing or benefiting from. His report endeavoured to establish a
user-pay system. He said in terms of that cost allocation exercise there were two
steps. The first step involved calculating the Body corporate’s actual costs. He
analysed the administrative fund of the Body corporate to determine the money
collected and spent in the day-to-day operations of the Body corporate. The second
step involved calculating the money required for the sinking fund. He analysed the
cost for replacement of items of a long term capital nature such as re-painting the
building. Therefore, he determined how much the Body corporate notionally was
spending each year. In doing so he allowed for extraordinary items and for periodic
payment, for example he did not allow for a repaint every year but rather allowed
for a re-paint every 10 years. Therefore, he distributed the painting expense over 10
years.
[17] Mr Sheehan then considered each of the items of expenditure and formed a
judgment how that was benefiting or being caused by each of the lots and then
allocated that expenditure according to that subjective determination. In his
evidence Mr Sheehan referred by way of an example to the expenditure by the Body
corporate for the payment of a tax return each year. In his opinion that in no way
was impacted upon by the size of the lot or whether it had a pool or access to a lift.
He saw that as a case of the Body corporate as a separate legal entity doing a tax
return. In his opinion that was a cost which should be shared equally so with that
item of expenditure he divided that cost by the number of lots, which in this case is
fifty-one lots and attributed to each lot an equal share of that cost. However, on
items such as painting as, in his opinion, that would bear some relationship to the
size of the particular lot, he distributed the painting expenditure based on the size of
-- 10 of 28 --
11
the particular lot. To do this he worked out how big the lot was compared to all
other lots and that gave him the percentage and he shared the percentage of the
painting of the entire budget through the percentage size that that lot actually was
and allocated that amount. He then added up all of the allocations and that
produced a percentage of expenditure that in his opinion was either caused by or
benefited that particular lot and determined that as a percentage out of 10,000. To
produce his report Mr Sheehan also inspected the common property areas of the
building. He also considered the Body corporate records and based on that
information he then determined how the costs should be shared for this particular
building.
[18] Mr Sheehan in his report identifies five methods by which it was appropriate to
share the costs.
[19] His first method involved the sharing of costs equally. That is, he considered
certain administrative and sinking fund items that should be shared amongst all lots
on an equal basis. Those items of expense either were directly proportional to the
number of lots in the Scheme (for example Body corporate administration contract)
or were fixed without reference to the number of lots (for example fee for
preparation of tax return). In his opinion by this method no particular lot placed any
greater or lesser demand on the underlying services.
[20] His second method involved the support and shelter costs. That is, in his opinion
the purpose of the structure of the building was to provide support and shelter to the
lots. Typical support and shelter costs included painting and roof repairs. In his
opinion the nature of the construction made it appropriate to share the support and
-- 11 of 28 --
12
shelter costs based on the area of the lot in proportion to the total area of all lots.
Intuitively, if Lot A was twice as big as Lot B then it required twice the support and
shelter.
[21] His third method involved the potential accommodation factor (bedrooms). Some
costs were directly related to the use of the common property. In his opinion the
use of the common property depended on the nature of the use of the lots, whether
residential or commercial and in the case of units that are residential, the number of
people who are resident in the complex or invited. In his opinion the most logical
determinant of the number of residents and invitees was the number of bedrooms, or
the potential accommodation factor. He said actual beds or actual residents, would
be a more accurate measure, but was a measure that may change daily.
Consequently, he considered it was inappropriate to use that as the basis for
calculating the long term contribution entitlement schedule. The static measure that
was most suitable was potential for accommodation.
[22] The fourth method related to lift costs. In his opinion lift costs deserved unique
treatment as the two towers benefit in different ways from the existence of the lifts.
In his opinion the costs associated with the provision of a working lift should be
shared equally between the two towers and then equally between the lots in those
towers.
[23] The fifth and final method related to the lattice costs. That is only 24 lots had
lattice. He therefore allocated the cost of the lattice only to those lots.
[24] In paragraph 10.2 of Mr Sheehan’s report his analysis of the costs expressed as a
percentage of the total costs was as follows:
-- 12 of 28 --
13
“Method Summary of Distribution Costs
1. Costs shared equally 74.08
2. Support and shelter costs 13.47
3. Potential accommodation factor –
bedrooms
1.93
4. Lift costs 10.14
5. Lattice costs 0.37”
[25] Mr Sheehan then simply created a percentage of costs attributable to the lot by
multiplying by 10,000 to express the percentage to two decimal points.
[26] Therefore, Mr Sheehan concluded that the contribution schedule for the Body
corporate should not be equal because it was just and equitable for the contributions
not to be equal. However, his analysis of the costs of the Body corporate dictated
the current schedule was not just and equitable. Therefore, his recommendation was
the current schedule be as set out in the final table of schedule 5 of his report.
[27] It is convenient to set out schedule 5 of Mr Sheehan’s report which includes a
comparison between the current lot entitlement and his recommended lot
entitlement:-
-- 13 of 28 --
14
“Centrepoint - Working paper 2002-04-15.xls –
Distribution of expenditure
„
Lot Number Method Method Method Method Method
Costs
attributable
to this lot
Suggested
Lot
Entitlements
as a % of
Total L/E
Current Lot
Entitlement
as a % of
Total L/E
Suggested
%
L/E as a %
of Current
%L/E
Suggested
Lot
Entitlement
Current Lot
Entitlement
Cost to be
distributed
among lots 74.08% 13.47% 1.93% 10.14% 0.37% 100.00%
1 1.45% 0.22% 0.03% 0.16% 0.02% 1.89% 1.89% 2.04% 92.59% 189 170
2 1.45% 0.36% 0.03% 0.16% 2.01% 2.01% 1.86% 108.20% 201 155
3 1.45% 0.28% 0.03% 0.16% 1.93% 1.93% 1.68% 114.96% 193 140
4 1.45% 0.31% 0.03% 0.16% 1.96% 1.96% 1.86% 105.57% 196 155
5 1.45% 0.26% 0.03% 0.16% 0.02% 1.92% 1.92% 1.74% 110.40% 192 145
6 1.45% 0.31% 0.03% ' 0.16% 1.96% 1.96% 1.92% 101.87% 196 160
7 1.45% 0.25% 0.03% 0.16% 1.90% 1.90% 1.74% 109.24% 190 145
8 1.45% 0.25% 0.05% 0.16% 1.92% 1.92% 1.92% 99.89% 192 160
9 1.45% 0.26% 0.03% 0.16% 0.02% 1.92% 1.92% 1.62% 118.67% 192 135
10 1.45% 0.26% 0.03% 0.16% 0.02% 1.92% 1.92% 1.80% 106.72% 192 150
11 1.45% 0.29% 0.03% 0.16% 1.94% 1.94% 1.98% 98.09% 194 165
12 1.45% 0.24% 0.03% 0.16% 1.89% 1.89% 1.80% 104.83% 189 150
13 1.45% 0.25% 0.05% 0.16% 1.92% 1.92% 1.98% 96.94% 192 165
14 1.45% 0.24% 0.03% 0.16% 0.02% 1.91% 1.91 % 1.68% 113.61 % 191 140
15 1.45% 0.25% 0.03% 0.16% 0.02% 1.92% 1.92% 1.86% 102.95% 192 155
16 1.45% 0.29% 0.03% 0.16% 1.94% 1.94% 2.04% 95.28% 194 170
17 1.45% 0.24% 0.03% 0.16% 1.89% 1.89% 1.86% 101.61 % 189 155
18 1.45% 0.27% 0.05% 0.16% 1.94% 1.94% 2.04% 94.84% 194 170
19 1.45% 0.26% 0.03% 0.16% 0.02% 1.92% 1.92% 1.74% 110.49% 192 145
20 1.45% 0.25% 0.03% 0.16% 0.02% 1.92% 1.92% '1.92% 99.89% 192 160
21 1.45% 0.38% 0.03% 0.16% 2.03% 2.03% 2.28% 88.81 % 203 190
22 1.45% 0.35% 0.05% 0.16% 2.02% 2.02% 2.52% 80.12% 202 210
23 1.45% 0.26% 0.03% 0.16% 0.02% 1.92% 1.92% 1.80% 106.89% 192 150
24 1.45% 0.25% 0.03% 0.16% 0.02% 1.91% 1.91% 1.98% 96.63% 191 165
25 1.45% 0.32% 0.03% 0.16% 1.97% 1.97% 2.34% 84.24 % 197 195”
-- 14 of 28 --
15
“Centrepoint - Working paper 2002-04-15.xls
Lot
Number
Method
1
Method
2
Method
3
Method
4
Method
5
Costs
attributable
to this lot
Suggested
Lot
Entitlements
as a % of
Total L/E
Current Lot
Entitlement
as a % of
Total L/E
Suggested
%
L/E as a %
of Current
% L/E
Suggested
Lot
Entitlement
Current Lot
Entitlement
26 1.45% 0.33% 0.05% 0.16% 2.00% 2.00% 2.58% 77.54% 200 215
27 1.45% 0.25% 0.03% 0.16% 0.02% 1.92% 1.92% 1.86% 103.19% 192 155
28 1.45% 0.25% 0.03% 0.16% 0.02% 1.92% 1.92% 2.28% 83.98% 192 190
29 1.45% 0.30% 0.03% 0.16% 1.95% 1.95% 2.64% 73.97% 195 220
30 1.45% 0.32% 0.05% 0.16% 1.99% 1.99% 2.88% 68.93% 199 240
31 1.45% 0.27% 0.03% 0.16% 0,02% 1.93% 1.93% 2.16% 89;43% 193 180
32 1.45% 0.20% 0.03% 0.25% 0.02% 1.96% 1.96% 1.56% 125.47% 1% 130
33 1.45% 0.16% 0.02% 0.25% 1.89% 1.89% 1.16% 161.92% 189 97
34 1.45% 0.16% 0.02% 0.25% 1.88% 1.88% 1.19% 158.39% 188. 99
35 1.45% 0.25% 0.05% 0.25% 0.02% 2.02% 2.02% 1.62% 124.80% 202 135
36 1.45% 0.22% 0.03% 0.25% 0.02% 1.98% 1.98% 1.56% 126.74 % 198 130
37 :1.45% 0.16% 0.02% 0.25% 1.89% 1.89% 1.19% 158.78% 189 99
38 1.45% 0.15% 0.02% 0.25% 1.88% 1.88% 1.24% 151.87% 188 103
39 1.45% 0.25% 0.05% 0.25% 0.02% 2.02% 2.02% 1.68% 120.07% 202 140
40 1.45% 0.21% 0.03% 0.25% 0.0:2% 1.97% 1.97% 1.62% 121,39% 197 135
41 1.45% 0.16% 0.02% 0.25% 1.88% 1.88% 1.21% 155.13% 188 101
42 1.45% 0.15% 0.02% 0.25% 1.88% 1.88% 1.26% 148.98% 188 105
43 1.45% 0.24% 0.05% 0.25% 0.02% 2.02% 2.02% 1.74% 115.84% 202 145
44 1.45% 0.43% 0.05% 0.25% 0.02% 2.21% 2.21% 3.18% 69.36% 221 265
45 1.45% 0.29% 0.05% 0.25% 0.02% 2.06% 2.06% 1.98% 104.20% 206 165
46 1.45% 0.33% 0.05% 0,25% 2.09% 2.09% 2.88% 72.43 % 209 240
47 1.45% 0.26% 0.05% 0.25% 0.02% 2.04% 2.04% 1.86% 109.44% 204 155
48 1.45% 0.34% 0.05% 0.25% 2.10% 2.10% 2.94% 71.31 % 210 245
49 1.45% 0.26% 0.05% 0.25% 0.02% 2.03% 2.03% 1.92% 105.86% 203 160
50 1.45% 0.33% 0.05% 0.25% 2.09% 2.09% 3.54% 58.92% 209 295
51 1.45% 0:26% 0.05% 0.25% 0.02% 2.03% 2.03% 2.22% 91.35% 203 185
Totals 74.08% 13.47% 1.93% 10.14% 0.37% 100.00% 100.00% 100.00% 10000 8329
„
-- 15 of 28 --
16
[28] Lot owners opposed to the application commissioned a report from Mr Linkhorn.
Although there were some differences in the approach taken by Mr Linkhorn
compared to the approach taken by Mr Sheehan, basically Mr Linkhorn’s
methodology was the same as that adopted by Mr Sheehan. Mr Linkhorn also
concluded that the Body Corporate’s current contribution lot entitlement schedule
was not just and equitable to all lot owners in the building. He therefore
recommended that the body corporate adopt in place of their current contribution lot
entitlement schedule a proposed schedule of contribution lot entitlement values
which he considered to be just and equitable in all the circumstances. Mr
Linkhorn’s recommendation is not significantly different to that proposed by Mr
Sheehan.
[29] However, the adoption of either Mr Sheehan’s recommendation or Mr Linkhorn’s
recommendation will result in an increase in monetary contributions from some lot
owners and a decrease in monetary contributions from other lot owners in the
future.
[30] Exhibit 1 in these proceedings is a schedule showing the lots in the Scheme, the
floor level of the lot, the number of bedrooms in the lot, the current lot entitlement
and a comparison between the SSKB recommendation and Mr Linkhorn’s
recommendation (DL and SS). It is as follows:-
-- 16 of 28 --
17
“Lot
Number
Floor
Levels
No of
Bedrooms
Current
Lot Entitlements
SSKB
Recommended Lot
Entitlements
DL & SS
Recommended Lot
Entitlements
Levy Per Unit of
Lot Entitlement $23.03 $19.18 $19.18
1 D,A 2 170 189 189
2 D,A 2 155 201 198
3 D,A 2 140 193 192
4 D,A 2 155 196 194
5 E,A 2 145 192 192
6 E,A 2 160 196 194
7 E,A 2 145 190 190
8 E,A 3 160 192 197
9 E,A 2 135 192 192
10 F,B 2 150 192 192
11 F,B 2 165 194 193
12 F, B 2 150 189 189
13 F,B 3 165 192 190
14 F,B 2 140 191 191
15 G,B 2 155 192 191
16 G,B 2 170 194 193
17 G,B 2 155 189 189
18 G,B 3 170 194 198
19 G,B 2 145 192 192
20 H,B 2 160 192 191
21 H,B 2 190 203 198
22 H,B 3 210 202 204
23 H,B 2 150 192 192
24 I,G 2 165 191 191
25 I,G 2 195 197 195
26 I,G 3 215 200 202
27 I,G 2 155 192 192
28 J, G 2 190 192 191
29 J, G 2 220 195 193
30 J, G 3 240 199 201
31 J, G 2 180 193 192
32 E,B 2 130 196 196
33 E,B 1 97 189 185
34 E,B 1 99 188 185
35 E,B 3 135 202 207
36 F,B 2 130 198 198
37 F,B 1 99 189 185
38 F,B 1 103 188 185
39 F,B 3 140 202 206
40 G,B 2 135 197 197
41 G,B 1 101 188 185
42 G,B 1 105 188 185
43 G,B 3 145 202 206
44 H, B 3 265 221 219
45 H,G 3 165 206 209
46 I, B 3 240 209 211
47 I,G 3 155 204 207
48 J, G 3 245 210 211
49 J, G 3 160 203 207
50 K,G 3 295 209 211
51 K,G 3 185 203 207
TOTALS 8,329 10,000 10,000
CENTREPOINT LOT NO'S, FLOOR LEVELS, BEDROOMS, CURRENT & RECOMMENDED ENTITLEMENT SCHEDULES - 27 Jan 04”
-- 17 of 28 --
18
[31] Evidence was given on the hearing of this application by Mr Smith, a certified
practising valuer of 31 years’ experience, that should the contribution schedule lot
entitlement change as proposed by Mr Sheehan then thirty-one or approximately
sixty-one per cent of the lots will have levy increases and twenty or approximately
thirty-nine per cent of the lots would have a reduction in the levy. Mr Smith did not
attempt to value the individual lots. However, his report demonstrated that for an
investor-owner of a lot subject to an increase in the levy the effect would be to
decrease the cash flow from the rental income, thus affecting negatively the return
on investment and for an owner-occupier the increased levy would create a negative
effect on the marketability of the unit. By way of example Mr Smith in his report
concludes the potential loss of value of lot 42 would be $35,487.
[32] Clearly, if Mr Sheehan’s recommendation or for that matter Mr Linkhorn’s
recommendation was accepted as the basis for an adjustment to the contribution
schedule lot entitlement there would be an increase in the annual contributions from
the five lot owners that gave evidence on the hearing of this application and
according to Mr Smith’s evidence the market value of their units could fall by a
factor of 18.18 times the annual increase in the amount of the levy. The following
is a table showing the impact upon the five lot owners who gave evidence on the
hearing of this application. That is not to say there would not be a similar impact on
some of the other lot owners in the Body corporate. However, the impact upon
these five lot owners is as follows:-
-- 18 of 28 --
19
“Name Lot Increase in contributions per
annum
Decrease in value
of lot
Mr and Mrs George 23 $342.13 $6,219.92
Mr and Mrs Baillee 36 $1,104.54 $21,898.54
Mr Makridakis 42 $1,779.69 $32,354.75
Mr Westcott 43 $801.98 $14,580.00
Mr Doherty 49 $313.22 $5,694.25”
[33] The Act provides that the owner of a lot may apply to the District Court for an order
for the adjustment of a lot entitlement schedule. Further, the order of the Court
must be consistent with, if the order is about the contribution schedule, the principle
stated in subsection 5 of Section 48. That subsection provides that for the
contribution schedule the respective lot entitlements should be equal, except to the
extent to which it is just and equitable in the circumstances for them not to be equal.
[34] In Ciriello v Panitz Centre Building Units Plan 3894 (1999) 20 Qld Lawyer Rep
138 His Honour Judge Brabazon QC noted that under the 1980 Act, there was no
way of adjusting the relative lot entitlements. His Honour noted the presumption
under the 1980 Act was that a purchaser would take into account the entitlements,
the burden of body corporate levies, the voting rights and the prospect of
extinguishment, in agreeing to a purchase price. His Honour noted the 1980 Act
was replaced by the Act which provided for the former lot entitlement schedule to
become two schedules as noted earlier. His Honour noted the Act introduced the
possibility of adjustments to those schedules. One possibility was for owners to
-- 19 of 28 --
20
agree to a change. If the owners did not agree His Honour noted the court had
power to order that one or both of the schedules be adjusted. His Honour said at
p 139:
“if an application is made, the order of the court must be consistent
with principles declared by the Act … those principles are:-
… for the contribution schedule, the respective lot entitlements
should be equal, except to the extent to which it is just and equitable
in the circumstances for them not to be equal.
Therefore, whether the application be allowed or refused, in the case
of each new schedule the orders of the court must be consistent with
the principles set out above.”
[35] It is to be noted the Act was amended in March 2003. The applicants submit the
changes made to the Act in March 2003 served to underline the presumption in
favour of equality. In support of this submission the applicants referred to the
following:
(a) A provision was inserted stipulating that even at the stage where
development approval was being sought, the equality principle
applied (section 46(7)).
(b) That parliament removed section 46 sub-section 1 which in its terms
had provided relevantly “it is not a requirement of the community
management statement for a community title scheme that the
contribution schedule lot entitlements be equal for each lot included
in the Scheme”.
(c) The explanatory notes specifically refer to the change as follows:-
“clause 10 amends section 44 to change the requirements for
the number that is allocated for the contribution schedule lot
entitlement. The change is intended to reinforce the concept
that usually all lot owners are equally responsible for the
cost of upkeep of common property and for the running
costs of the community title scheme. However, it is
recognised that there may be valid instances where the
contribution schedules do not have to be equal. The
amendment provides that usually all the number in this
schedule are equal, unless it can be demonstrated that it is
just and equitable for there to be inequality …”.
(d) The explanatory notes proceed to give examples. In particular
example 3 provides :-
-- 20 of 28 --
21
“In a basic scheme, if all the lots are residential lots ranging
in size from a small lot to a penthouse, the contribution
schedule lot entitlements generally would be equal.
However, the contribution schedule may be different if the
penthouse has its own swimming pool and private lift. The
contribution schedule should recognise this type of
difference. The other lots in the scheme despite being of
differing size or aspect would be expected to have equal
contribution schedule lot entitlements …”
[36] His Honour Judge Brabazon QC in Ciriello at p 139 noted with respect to the 1980
Act:-
“Usually a lot entitlement reflected the expected market value of the
lot. Sometimes the entitlements reflected the self interest of the
developer, or were based on the level of body corporate levies that
might be generated by a particular lot, or were based on the area of
the building which the lot occupied. Occasionally, there was no
apparent explanation at all for the allocation.”
[37] The applicants submit it would only be by an amazing coincidence if the schedules
inherited from the legislation as it stood before the amendments comply with the
criteria provided for by the Act.
[38] However, the respondent submits it is clear from an examination of the existing
contribution schedule the schedule was the product of a consideration of differences
in the size and location of the lots and are weighted accordingly. Therefore, the
respondent submits the existing contribution schedule provides a just, equitable and
appropriate means of differentiating between the lot owners. In that way the
existing contribution schedule was not inconsistent with the provisions of the Act.
[39] The applicants submit that a consideration of the Act as a whole and the explanatory
notes and even the second reading speech all point to the court being required to
have regard to the physical characteristics of the Scheme and its uses rather than
matters that may be peculiar to particular owners. Characteristics peculiar to a
-- 21 of 28 --
22
particular owner would include the financial means of an owner to meet an increase
in the contributions were an adjustment to be ordered and whether a lot owner
purchased a lot on the expectation that the body corporate levies were for a
particular amount and if increased would be increased by factors such as the
movement in the consumer price index rather than by a court ordered adjustment
pursuant to provisions of the Act.
[40] The applicants submit that I either adopt Mr Sheehan’s recommendation or Mr
Linkhorn’s recommendation. However, if I was not prepared to accept either of
those recommendations that I would, in any event, order an adjustment on the basis
that the contributions be equal.
[41] In Re: Kurilpa Protestant Hall Pty Ltd (1946) St R Qd 170 at 183 Macrossan CJ
said regarding the expression “just and equitable” in the legislation for the winding
up of companies:-
“The words “just and equitable” are words of the widest significance
and do not limit the jurisdiction of the court to any case. It is a
question of fact and each case must depend on its own
circumstances.”
[42] His Honour Judge Brabazon QC in Burnitt Investments Pty Ltd v Body Corporate St
Andrews Community Titles Scheme 20508 (2002) QDC 6 cited In re Kurilpa when
considering the use of the words “just and equitable” in an application for a
reduction of lot entitlements.
[43] In Sandhurst Trustees Limited Ltd (ACN 004030737) v Condah Bay Investments
Pty Ltd (ACN 050 287 206) & Ors (2003) QDC 438 His Honour Judge Robin QC at
para 10 said:-
-- 22 of 28 --
23
“The legislative policy favouring equality of lot entitlements for the
contribution schedule is clear.”
Further, His Honour said at para 11 with reference to the amendments to the
legislation since His Honour Judge Brabazon QC’s decision in Burnitt:-
“The court no longer enjoys the untrammelled freedom it did at the
time of that decision.”
Further, His Honour said at para 12 with respect to s 49 of the Act:-
“In my opinion, the new provision reinforces what has been the
principle all along that some positive justification must be shown for
departing from equality. I think it is inherent that equality is taken to
be a ‘just and equitable’ arrangement, even if, as in Burnitt (at the
time of the application), the assumption is difficult to justify. The
new sub-s 4 of s 49 requires the court to have regard to matters of the
kind that were the subject of evidence in contrary ‘expert’ opinions
of Mr Sheahan and his protagonist engaged by the respondents, Mr
Linkhorn.”
[44] Finally, His Honour said at paras 14 and 15:-
“In my opinion, applications such as the present should not be
approached on the footing that there is a single “just and equitable”
solution. There may be many views open, subtly, even glaringly
different, which could reasonably be seen as ‘just and equitable.” If
there is very little to distinguish the lots – for example, they are units
of like size in a “6 pack” – it is unlikely the equality principle could
be displaced. Here, the lots are quite easily seen to fit into different
categories. The commercial lots are all at ground level, indeed,
depend for their viability on their street frontages, one would think.
The residential units are readily capable of differentiation as well,
should one be minded to differentiate, as happened when the existing
lot entitlement schedules were drawn up; they range from studio
units to penthouses and a four bedroom unit. The occupants of the
larger units will presumably make more use of common facilities and
cause more wear and tear. As will be seen, it is suggested that the
owners of ground floor residential lots ought not to have to
contribute to running costs for lifts; if ground floor residents use a lift
that, it is said, can be allocated against the higher level units being
accessed. Minds may differ about this, also about whether those who
use lifts to access higher floors should pay no more than those who
travel only to the lower floors.
Another issue as to which approaches may vary concerns whether
regard is had to the use owners of individual lots or their invitees
may actually make of common property, the swimming pool and
garden surroundings in particular, or to the use they may potentially
make of those facilities. There may be owner-residents incapable of
-- 23 of 28 --
24
using the pool, because of physical limitations. Should they have to
pay for its upkeep? It is not going to be feasible to make adjustments
periodically to implement what may be “just” or “equitable” as
circumstances of this kind change. One would expect new
arrangements to be set having regard to the long term, accepting that
things may change with respect to particular lots in the short term.
One might not expect the entitlement of a commercial unit to be
reviewed every time the nature of the occupier’s business changed.”
[45] I do not take His Honour Judge Robin QC’s judgment in Sandhurst as establishing
that on an application such as the present application the Court is bound to order in
terms of the opinion of Mr Sheehan or Mr Linkhorn. Further, I do not accept that if
the Court does not order in terms of the opinion of either Mr Sheehan or Mr
Linkhorn the only alternative is to make an order that the contributions be equal.
[46] On the hearing of an application pursuant to section 48(1)(a) of the Act the Court
may have regard to:-
(a) how the community titles scheme is structured; and
(b) the nature, features and characteristics of the lots included in the
Scheme; and
(c) the purpose for which the lots are used (s 49(4)).
However, the Court is not limited to the matters stated in section 49(4) (s 49(3)).
[47] Mr Sheehan and Mr Linkhorn in their reports identified the costs of the Body
corporate they thought should be treated equally and at the same time identified
costs of the Body corporate they thought should not be treated equally. As to the
costs of the Body corporate they both thought should not be treated equally they
both gave consideration to factors such as the size of the lot and the number of
bedrooms in a lot.
-- 24 of 28 --
25
[48] Even though there was no evidence how the original lot entitlements were
established, I am satisfied the existing lot entitlements reflect a differentiation
between the lots based on the size of the lot, number of bedrooms in the lot and
location of the lot in the building. Further, this differentiation has been in existence
since the Scheme’s inception.
[49] Further, I am satisfied owners of lots including the five lot owners who gave
evidence in the respondent’s case purchased their lot on the basis of the existing lot
entitlement contributions and paid for their lots a price based amongst other things
upon the existing lot entitlement contributions. It is correct to say the Act allows for
an application to be made to this Court for an order for the adjustment of a lot
entitlement schedule. Further, a purchaser of a lot is to be presumed to know the
law which would include in this instance that the Act permits an application to be
made for an adjustment of a lot entitlement schedule. However, I do not accept the
Court can ignore the basis upon which lot owners opposed to the application did
purchase their lot.
[50] Further, even though Mr Sheehan and Mr Linkhorn used the size of a lot and the
number of bedrooms in the lot, no weight appears to have been given by either Mr
Sheehan or Mr Linkhorn to the location of a particular lot. In my opinion the
nature, features and characteristics of a lot which is one of the matters the Court
may have regard to when deciding just and equitable circumstances is wide enough
to include the location of a lot. In my opinion there are two aspects to the location
of a lot. These two aspects are the position of the lot in the building as in what level
the lot is on and secondly the aspect that might be enjoyed by that particular lot. I
accept location in the sense I am considering location in this application is
-- 25 of 28 --
26
something that would be difficult to quantify. Further, by definition Mr Sheehan
and Mr Linkhorn have approached their task by considering the money required to
fund the Body corporate’s expenses and have sought to determine the costs incurred
because of a particular lot. However, the application of their approach to an item of
expenditure that can be clearly seen is generated because of a particular lot does not
cause the difficulty. The difficulty arises when the expense being examined is said
to be caused equally by all the lots and yet not all the lots are equal in size, number
of bedrooms and location in the building. I accept the lots in this building are very
different. I accept this building has a particular composition, is unique and is very
diverse. I do not accept the Act demands the application of the user pays approach
particularly when the application of size of the lot and number of bedrooms in the
lot produces little by way of differentiation between the lots. That is I do not accept
the approach taken by Mr Sheehan or Mr Linkhorn gives any weight to the location
of a particular lot in the building having regard to both aspects of location of a lot in
the building let alone giving sufficient weight to the size of a lot and the number of
bedrooms in a lot.
[51] I can accept the expenditure required by way of example for the lattice is an item of
expenditure generated because of a particular lot. On the other hand an owner of a
particular lot with lattice may argue the location of another lot generates more
expenditure for some other item of expenditure because of the location of that other
lot. Even though the quantification of the expenditure because of location is
difficult, in my opinion, that does not mean no weight should be given to that matter
when considering what is just and equitable. Take by way of another example
expenditure relating to the lifts. According to Mr Sheehan that expenditure should
be divided equally between the two towers and then equally between the lots in each
-- 26 of 28 --
27
tower. In my opinion it could be argued a one bedroom lot on E level does not
generate an equal cost of maintaining and servicing the lift to a three bedroom lot on
K level. Further, the use of a ratio of floor area between the two lots in that
example may not be just and equitable. That is, the ratio of lot size say between lot
33 on E level and lot 51 on K level is about 1:1.5. However, the three bedroom lot
on K level it could be argued generates six times the cost of maintaining and
servicing the lift in that tower because there are six levels between the two lots.
[52] In my opinion the size of a lot or the number of bedrooms in a lot does not
numerically produce a ratio creating such a differentiation between lots of different
size or bedrooms located in different parts of the building that can be balanced
justly and equitably against the weight to be given to the location of the lot in the
building. That is so, in my opinion, even if location of the lot is limited to its level
in the building rather than considering what aspect is enjoyed by that lot. In my
opinion some lot owners would argue the aspect enjoyed by a lot is also a relevant
matter to what is just and equitable.
[53] Further, I am satisfied there is potential for a reduction in the value of the lots for
which the contributions will be increased if an adjustment is ordered as proposed.
Again, I do not accept the Court can ignore this potential on this application.
[54] Finally, in this instance a majority of the lot owners in the Body corporate do not
support the application.
[55] I accept there are some expenses of the Body corporate that should not be shared
equally. An example of these expenses is the expenses relating to the lattice.
Therefore, I am satisfied it is just and equitable that the contribution not be equal.
-- 27 of 28 --
28
However, I am not satisfied the approach of Mr Sheehan and Mr Linkhorn gives
sufficient weight to the size of the lot, the number of bedrooms in the lot and the
location of the lot.
[56] Therefore, having regard to all the matters I have referred to on the evidence in this
application I am not satisfied the existing contribution lot entitlement schedule
should be adjusted.
[57] I therefore dismiss the application.
-- 28 of 28 --
Official source: https://www.sclqld.org.au/caselaw/QDC/2004/017