Pipelines Regulations 2000
i
Pipelines Regulations 2000
S.R. No. 90/2000
TABLE OF PROVISIONS
Regulation Page
PART 1—PRELIMINARY 1
1. Objectives 1
2. Authorising provision 1
3. Revocation 2
4. Definitions 2
PART 2—PERMITS TO OWN AND USE PIPELINES 3
5. Application for consent to enter land to make surveys or
examinations 3
6. Production of written consent 4
7. Permit application 4
8. Terms and conditions of permit 4
9. Application for consolidation or replacement of permit 5
10. Application for variation of permit (other than variation of
authorized route) 5
11. Additional notice of application 5
12. Notice of proposed grant of permit 5
13. Application for renewal of permit 5
14. Application for Minister's direction 6
PART 3—ACQUISITION OF RIGHTS OVER LAND 7
15. Application to compulsorily acquire an easement 7
PART 4—LICENCES TO CONSTRUCT AND OPERATE A
PIPELINE 8
16. Licence application 8
17. Information required for renewal of licence 8
18. Application for variation of licence (other than variation of
authorized route) 8
PART 5—CONSTRUCTION, OPERATION AND TESTING OF
PIPELINES 9
-- 1 of 24 --
Regulation Page
ii
19. Construction, operation and maintenance standards 9
20. Information required to obtain consent to operate 9
21. Pipeline operation fee 9
22. Escape or ignition of any thing conveyed in a pipeline 10
23. Incident reporting 11
24. Interference with incident site 11
25. Security of pipeline 12
__________________
SCHEDULES 13
SCHEDULE 1—Application for a permit to own and use a
pipelines. 9 13
SCHEDULE 2—Application for consolidation/replacement of
permit—s. 12A 15
SCHEDULE 3—Application for variation of pipeline permit—s. 12B(2) 16
SCHEDULE 4—Notice of application for pipeline permit—s. 12D 17
SCHEDULE 5—Application for the renewal of a permit to own and use a
pipelines. 13 18
SCHEDULE 6—Application for pipeline licences. 26 19
SCHEDULE 7—Application for variation of pipeline licence—s. 28A(2) 20
═══════════════
ENDNOTES 21
-- 2 of 24 --
1
STATUTORY RULES 2000
S.R. No. 90/2000
Pipelines Act 1967
Pipelines Regulations 2000
The Governor in Council makes the following Regulations:
Dated: 26 September 2000
Responsible Minister:
CANDY BROAD
Minister for Energy and Resources
HELEN DOYE
Clerk of the Executive Council
PART 1—PRELIMINARY
1. Objectives
The objectives of these Regulations are—
(a) to prescribe various forms, fees and
procedures authorised by the Pipelines Act
1967; and
(b) to set out requirements relating to the
construction, operation and testing of
pipelines.
2. Authorising provision
These Regulations are made under section 47 of
the Pipelines Act 1967.
-- 3 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
2
3. Revocation
The following regulations1 are revoked
(a) the Pipelines (Fees) Regulations 19902 ;
(b) the Pipelines (Fees) Regulations 19913 ;
(c) the Pipelines (Fees) Regulations 19924 ;
(d) the Pipelines (Fees) Regulations 19955 .
4. Definitions
In these Regulations—
"the Act" means the Pipelines Act 1967;
"licence" means a licence issued under Part IV of
the Act;
"permit" means a permit granted under Part II of
the Act.
_______________
r. 3
-- 4 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
3
PART 2—PERMITS TO OWN AND USE PIPELINES
5. Application for consent to enter land to make surveys
or examinations
An application for consent under section 8A of the
Act must include the following particulars—
(a) the name and address of the applicant;
(b) if the application relates to land owned
privately—
(i) the name and address of the owner or
occupier; and
(ii) title details or particulars;
(c) if the application relates to land owned by
the Crown, the name of the controlling
organisation;
(d) details of the proposed survey or
examination;
(e) the intended use of the proposed pipeline;
(f) the name and address of the person or
organisation engaged to carry out the survey
or examination of the route of the pipeline;
(g) the steps previously taken to obtain
permission to enter the land and any known
reason for the failure to obtain permission;
(h) a map drawn to a scale of not less than
1:25 000 showing—
(i) the relevant portion of the intended
route along which the survey or
examination is proposed to be made;
and
r. 5
-- 5 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
4
(ii) the location, allotment and section
numbers and the parish and municipal
names and the boundaries of lands
relating to the proposed survey or
examination.
6. Production of written consent
(1) A person who has obtained the consent of the
Minister under section 8A of the Act must
produce the consent to the owner or occupier of
the land before entering the land to conduct any
survey or examination.
(2) Sub-regulation (1) does not apply if the person
was unable to produce the consent before entering
the land because he or she was unable to contact
the owner or occupier of the land after making
reasonable attempts to do so.
7. Permit application
(1) The form for the purposes of section 9 of the Act
is set out in Schedule 1.
(2) The scale of map for the purposes of section
10(1)(d) of the Act is the scale of 1:25 000.
(3) The application fee for the purposes of section
10(1)(e) of the Act is $10 000.
8. Terms and conditions of permit
A permit granted by the Minister under section
12(1) of the Act is subject to the following terms
and conditions—
(a) unless otherwise approved in writing by the
Minister, the holder of the permit must
commence construction of the pipeline
within 12 months of the issue of the permit
and complete construction within 3 years of
the commencement of construction;
r. 6
-- 6 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
5
(b) the holder of the permit must, as soon as is
practicable after the completion of the laying
of the pipeline, lodge with the Minister
2 copies of a map showing the route of the
pipeline and details of the land through
which the pipeline is laid.
9. Application for consolidation or replacement of
permit
(1) The form for the purposes of section 12A(2) of the
Act is set out in Schedule 2.
(2) The scale of map for the purposes of section
12A(2)(c) of the Act is the scale of 1:25 000.
10. Application for variation of permit (other than
variation of authorized route)
The form for the purposes of section 12B of the
Act is set out in Schedule 3.
11. Additional notice of application
The form for the purposes of section 12D(2)(a) of
the Act is set out in Schedule 4.
12. Notice of proposed grant of permit
The prescribed particulars for the purposes of
section 12G(1) of the Act are—
(a) the proposed authorised route of the pipeline;
and
(b) details of any alterations from the proposed
authorised route advertised in accordance
with the Act; and
(c) the thing to be conveyed through the
pipeline.
13. Application for renewal of permit
The form for the purposes of section 13(1) of the
Act is set out in Schedule 5.
r. 9
-- 7 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
6
14. Application for Minister's direction
The fee for the purposes of section 17(3) of the
Act is $724.
_______________
r. 14
-- 8 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
7
PART 3—ACQUISITION OF RIGHTS OVER LAND
15. Application to compulsorily acquire an easement
An application by a permittee for the written
permission of the Minister under section 22 of the
Act to compulsorily acquire an easement over
private land must include
(a) the name and address of the permittee; and
(b) details of the permit, including
(i) the permit number; and
(ii) the things authorised to be conveyed
through the pipeline; and
(c) a description of the relevant private land,
including
(i) the name and address of the owner; and
(ii) title details or particulars; and
(iii) a plan drawn to a scale of not less than
1:25 000 showing the property
boundary and the route of the pipeline
across the property; and
(d) details of attempts to negotiate a settlement
with the owner of the land.
_______________
r. 15
-- 9 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
8
PART 4—LICENCES TO CONSTRUCT AND OPERATE A
PIPELINE
16. Licence application
(1) The form for the purposes of section 26(1) of the
Act is set out in Schedule 6.
(2) The scale of map for the purposes of section
26(2)(d) of the Act is the scale of 1:25 000.
17. Information required for renewal of licence
For the purposes of section 27B(1) of the Act, the
information to be provided to the Minister at each
renewal under section 13 of the Act is
(a) the expiry date of the current licence; and
(b) details of any thing conveyed in the pipeline;
and
(c) the reasons for renewing the licence; and
(d) the things proposed to be conveyed in the
pipeline; and
(e) details of any alterations to the pipeline
route.
18. Application for variation of licence (other than
variation of authorized route)
The form for the purposes of section 28A of the
Act is set out in Schedule 7.
_______________
r. 16
-- 10 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
9
PART 5—CONSTRUCTION, OPERATION AND TESTING OF
PIPELINES
19. Construction, operation and maintenance standards
For the purposes of sections 30(1) and 35(1C) of
the Act, a pipeline must be constructed, operated
and maintained in accordance with the following
Australian Standards published by Standards
Australia as amended from time to time
(a) AS 2885.1—1997: Pipelines—Gas and
liquid petroleum, Part 1: Design and
Construction;
(b) AS 2885.2—1995: Pipelines—Gas and
liquid petroleum, Part 2: Welding;
(c) AS 2885.3—1997: Pipelines—Gas and
liquid petroleum, Part 3: Operation and
maintenance.
20. Information required to obtain consent to operate
A licensee who applies for consent to operate a
pipeline under section 35 of the Act must submit
to the Minister
(a) the results of any pipeline tests and pressure
and leak tests of the pipeline; and
(b) any other information requested by the
Minister in relation to the safe operation or
the environmental impact of the pipeline.
21. Pipeline operation fee
For the purposes of section 35(2) of the Act, the
pipeline operation fee is $162 per kilometre or
part of a kilometre of pipeline operated under the
licence.
r. 19
-- 11 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
10
22. Escape or ignition of any thing conveyed in a pipeline
(1) This regulation does not apply to a pipeline to
which the Gas Safety Act 1997 applies.
(2) A licensee, upon becoming aware of the escape or
ignition of any thing being conveyed in a pipeline,
must immediately—
(a) take action to protect people and property;
and
(b) take or cause to be taken such action as is
necessary to prevent or, if it is not
practicable to prevent, minimise—
(i) the ignition or escape of the thing in the
pipeline; and
(ii) the pollution of the surrounding lands
and waters by the thing.
(3) Sub-regulation (2) applies in addition to any
action the licensee is required to take under
section 38 of the Act.
(4) The licensee must, as soon as possible and not
later than 24 hours after the pipeline is repaired,
submit a written report to the Minister giving full
information regarding—
(a) the time and place of the escape or ignition;
and
(b) the nature of and the approximate quantity of
the thing which escaped; and
(c) the damage resulting from the escape or
ignition; and
(d) the conditions that caused or contributed to
the escape or ignition (if known); and
(e) the methods adopted to carry out repairs.
r. 22
-- 12 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
11
23. Incident reporting
(1) This regulation does not apply to a pipeline to
which the Gas Safety Act 1997 applies.
(2) A licensee must immediately report to the
Minister any incident which arises out of any
work concerned with the construction and
operation of a pipeline if—
(a) any person suffers a serious injury or is
killed; or
(b) there is substantial damage to or destruction
of property or the environment.
(3) The report must be in writing and provide all
relevant details and information relating to the
incident.
(4) A licensee must—
(a) keep a record of incidents which occur
during the construction and operation of a
pipeline; and
(b) submit to the Minister copies of the incident
records at intervals not exceeding one
month.
24. Interference with incident site
A person must not interfere with the place of an
incident referred to in regulation 23 except as is
necessary to provide—
(a) immediate assistance to any person injured
or to recover the body of any person killed as
a result of the incident; or
(b) for the immediate protection of property or
the environment.
r. 23
-- 13 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
12
25. Security of pipeline
(1) This regulation does not apply to a pipeline to
which the Gas Safety Act 1997 applies.
(2) For the purposes of establishing and maintaining
the security and safe operation of the pipeline, the
licensee must cause the pipeline to be patrolled on
a regular basis.
(3) The licensee must
(a) keep a written report of each patrol; and
(b) submit those reports to the Minister on
request.
__________________
r. 25
-- 14 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
13
SCHEDULES
SCHEDULE 1
Reg. 7
Pipelines Act 1967
Pipelines Regulations 2000
APPLICATION FOR A PERMIT TO OWN AND USE A
PIPELINES. 9
To: Minister for Energy and Resources
I apply for a permit to own and use a pipeline and submit the following
particulars:
1. Name of applicant.
2. Business address of applicant.
3. Applicant's principal place of business.
4. Applicant's ACN number (if applicable).
5. Applicant's contact details including telephone number, facsimile
number and email address.
6. Agent's contact details (if applicable).
7. Use to which proposed pipeline will be placed.
8. Anticipated date of commencement of construction.
9. Expected date of completion of construction.
10. Brief description of route of pipeline—
to be accompanied by a map showing the proposed route of the
pipeline, any significant landmarks and the Crown allotment number,
drawn to a scale of not less than 1:25 000. The title details or
particulars of land along the proposed route must be attached to this
application.
11. Will the proposed pipeline be leased to, or used by, any other persons,
organisation, company, etc.? If so, give full particulars, including
purpose.
12. Brief description of proposed pipeline, e.g. length, pipe type and
diameter, pumping stations, ancillary structure etc.
Sch. 1
-- 15 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
14
13. Details of any environmental impacts of the proposed pipeline and the
proposed measures to eliminate or minimise those impacts.
A fee of $ is enclosed.
(Signature of applicant or company seal)
(Designation or position in organisation)
Date:
—————————
Sch. 1
-- 16 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
15
SCHEDULE 2
Reg. 9
Pipelines Act 1967
Pipelines Regulations 2000
APPLICATION FOR CONSOLIDATION/REPLACEMENT
OF PERMIT—S. 12A
To: Minister for Energy and Resources
I, , apply under section 12A of the Pipelines Act 1967 for the
*consolidation/*replacement of pipeline permit no. and submit the
following particulars:
1. Address of applicant.
2. Telephone no.
3. Particulars of permits to be *consolidated/*replaced
(1) Brief description of route of each pipeline (attach maps showing
pipeline routes—scale not less than 1:25 000 and attach map
showing proposed pipeline route for *consolidated/*replaced
permits—scale not less than 1:25 000).
(2) Current use of each pipeline.
4. Will an additional length of authorised route of the pipeline be required?
If yes, provide details.
5. State reasons for *consolidation/*replacement of permit.
(Signature of applicant/company seal)
(Designation or position in organisation)
Date:
* Strike out whichever is inapplicable
—————————
Sch. 2
-- 17 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
16
SCHEDULE 3
Reg. 10
Pipelines Act 1967
Pipelines Regulations 2000
APPLICATION FOR VARIATION OF PIPELINE PERMIT—
S. 12B(2)
To: Minister for Energy and Resources
I, , apply for a variation of pipeline permit no. issued to me.
The *particulars of the proposed variation are:
The reasons for the proposed variation are:
(Signature of applicant/company seal)
(Designation or position in organisation)
Date:
*A map showing the proposed variation is to be attached.
—————————
Sch. 3
-- 18 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
17
SCHEDULE 4
Reg. 11
Pipelines Act 1967
Pipelines Regulations 2000
NOTICE OF APPLICATION FOR PIPELINE PERMIT—S. 12D
Take notice that of
(name of person or company) (address)
applied on for a permit to own and use a pipeline under the
(date)
Pipelines Act 1967.
1. The particulars of the proposed pipeline are:
(Insert details of—
(a) the use to which pipeline will be put;
(b) the anticipated date of commencement/completion of construction).
2. The proposed authorised route of the pipeline is—
All persons who may be affected by the grant of this application
may send to the Minister for Energy and Resources on or
before (date) submissions which they may wish to make
with respect to the application. The submission may state that the person
making the submission wishes to be heard with respect to that
submission.
The application and details relevant to it may be inspected at—
(a) relevant offices of the Department of Natural Resources and
Environment;
(b) (insert business address of company/person applying for permit);
(c) relevant Council or Municipal offices.
—————————
Sch. 4
-- 19 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
18
SCHEDULE 5
Regulation 13
Pipelines Act 1967
Pipelines Regulations 2000
APPLICATION FOR THE RENEWAL OF A PERMIT TO
OWN AND USE A PIPELINES. 13
To: Minister for Energy and Resources
I apply for the renewal of permit no. to own and use a pipeline
and submit the following particulars:
1. Name of permittee.
2. Business address of permittee.
3. Current permit Date issued:
Date expires:
4. Is the pipeline for which the current permit is issued still in use?
5. What is the pipeline carrying at present?
6. State reasons for requiring renewal of permit and what the pipeline will
be used to carry.
7. Detail any alterations to the pipeline route. A plan of the pipeline as
constructed and operating showing all route variations or amendments
must be attached whether there are alterations to the pipeline route or not.
8. Period for which renewal of permit is required (in years or to a specified
date). Note: Section 13(4) of the Act allows the Minister to determine the
period for which the permit is renewed.
(Signature of applicant/company seal)
(Designation or position in organisation)
Date:
—————————
Sch. 5
-- 20 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
19
SCHEDULE 6
Reg. 16
Pipelines Act 1967
Pipelines Regulations 2000
APPLICATION FOR PIPELINE LICENCES. 26
To: Minister for Energy and Resources
I apply for a licence to construct and operate a pipeline and submit the
following particulars:
1. Name of applicant.
2. Business address of applicant.
3. Things *authorised to be conveyed/*being conveyed through pipeline.
4. Brief description of authorised route of pipeline (including starting and
finishing points). A plan drawn to a scale of not less than 1:25 000
showing all particulars required must be attached.
5. Number and date of issue of permit
permit no.
date issued
(Signature of applicant/company seal)
(Designation or position in organisation)
Date:
* Strike out whichever is inapplicable
—————————
Sch. 6
-- 21 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
20
SCHEDULE 7
Reg. 18
Pipelines Act 1967
Pipelines Regulations 2000
APPLICATION FOR VARIATION OF PIPELINE LICENCE—
S. 28A(2)
To: Minister for Energy and Resources
I, , apply for a variation of pipeline licence no. issued to me.
The *particulars of the proposed variation are:
The reasons for the proposed variation are:
(Signature of applicant/company seal)
(Designation or position in organisation)
Date:
* A plan showing the proposed variation is to be attached.
═══════════════
Sch. 7
-- 22 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
21
ENDNOTES
1 Reg. 3: The Pipelines Regulations 1988 (S.R. No. 243/1988) as extended by
the Subordinate Legislation (Pipelines Regulations 1988Extension of
Operation) Regulations 1999 (S.R. No. 67/1999) were revoked on
30 June 2000 by virtue of the operation of section 5 of the Subordinate
Legislation Act 1994.
2 Reg. 3: S.R. No. 375/1990.
3 Reg. 3: S.R. No. 320/1991.
4 Reg. 3: S.R. No. 285/1992.
5 Reg. 3: S.R. No. 177/1995.
——
Table of Applied, Adopted or Incorporated Matter Required by
Subordinate Legislation Regulations 1994
Note that the following table of applied, adopted or incorporated matter is
included in accordance with the requirements of regulation 6 of the Subordinate
Legislation Regulations 1994.
Statutory Rule
Provision
Title of applied, adopted or
incorporated document
Matter in
applied,
adopted or
incorporated
document
Regulation 19 Australian Standard
AS 2885.1—1997:
Pipelines—Gas and liquid
petroleum, Part 1: Design and
construction. Published by
Standards Australia on 5 May
1997
The whole
document
Regulation 19 Australian Standard
AS 2885.2—1995:
Pipelines—Gas and liquid
petroleum, Part 2: Welding.
Published by Standards
Australia on 5 February 1995
The whole
document
Endnotes
-- 23 of 24 --
S.R. No. 90/2000
Pipelines Regulations 2000
22
NOTES—continued
Statutory Rule
Provision
Title of applied, adopted or
incorporated document
Matter in
applied,
adopted or
incorporated
document
Regulation 19 Australian Standard
AS 2885.3—1997:
Pipelines—Gas and liquid
petroleum, Part 3: Operation
and maintenance. Published
by Standards Australia on
5 May 1997
The whole